| Location: | California |
|---|---|
| Posted: | Jan 30, 2025 |
| Due: | Feb 7, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA255025Q0005 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The contractor shall provide all tools, materials, equipment and personnel necessary to provide modular furniture reconfiguration, disassemble, remove, receive, deliver, and install new furniture, parts and installation in the Delta 8/10 SOPS Operations Center,
building 375, Naval Base Ventura County, Point Mugu, California.
The contractor shall design, deliver, and install 10 modular consoles, 4 filing cabinets, and 4 bookshelves and disassemble and remove existing consoles and replace existing operator consoles and technical furniture with 9 consoles, 4 filing cabinets, and 4 bookshelves.
Solution shall maximize operator ergonomics, be a cohesive configuration designed for 24/7 mission critical operation addressing existing needs and sustainable for future operator and equipment modifications and provide a more efficient work environment with a return on investment that will ensure a future forward solution for many years to come. Furniture shall be cohesive in materials to
ensure maximum longevity.
Please see attachments for additional information and instructions for base access for scheduled site visit on 15 January 2025.
Amendment 1
The purpose of this amendment is to extend the offers due date to 3 February 2025 1:00 PM PST. Also, incorporate the new PWS dated 27 January 2025, and incorporate Attachment 5 - Site Visit QnA. Small changes to the PWS include removal of all monitor arms requirements and clarification on furniture surface material.
Amendment 2
The purpose of this amendment is to extend the offers due date to 7 February 2025 1:00 PM PST. Also, incorporate the new PWS dated 30 January 2025, and incorporate Attachment 5 - Site Visit QnA Revision 2, and Small changes to the PWS include the addition of 1 work chair from 36 to 37, clarification on console surfaces, clarification on monitor arms being allowed for a horizontal track system, and removal of the pencil stop.
| Dec 20, 2024 | [Combined Synopsis/Solicitation (Original)] 10 SOPS Operations Console Furniture Requirement |
| Jan 27, 2025 | [Combined Synopsis/Solicitation (Updated)] 10 SOPS Operations Console Furniture Requirement |

With GovernmentContracts, you can:
...Follow 70 ARS Office Furniture, Travis AFB CA Active Contract Opportunity Notice ID ...
DEPT OF DEFENSE
Bid Due: 8/05/2026
...Follow 349 MDG Office Furniture Refresh, Travis AFB, CA Active Contract Opportunity Notice ...
DEPT OF DEFENSE
Bid Due: 8/14/2026
...- Interior finishing furnishing & remodeling - Office furniture installation or reconfiguration...
State Government of California
Bid Due: 8/11/2026
...& remodeling - Office furniture installation or reconfiguration Contact Information Name Gaurav... the ...
State Government of California
Bid Due: 8/05/2026