| Location: | California |
|---|---|
| Posted: | Aug 26, 2026 |
| Due: | Sep 24, 2026 |
| Agency: | City of Santa Cruz |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB No. PW-0324 |
| Publication URL: | To access bid details, please log in. |
Project ID: IFB No. PW-0324
Title: HSIP CYCLE 11 & 12: UNSIGNALIZED CROSSING IMPROVEMENT PROJECT
Addenda: 0
Release Date: 8/26/2026
Due Date: 9/24/2026
The Project to be performed consists of furnishing all labor, materials, tools, equipment, and transportation required to complete the Project, with a scope of work to generally include, but is not limited to, the following: Installing concrete curbs, gutters, sidewalk, curb ramps, roadway signs, pedestrian activated beacons and striping and pavement markings. All other work not mentioned above that is required by the plans, City Standard Specifications, State Standard Specifications and the Special Provisions shall be performed, placed, constructed or installed.

With GovernmentContracts, you can:
Project ID: 4711 Title: Kiefer Landfill- Module 5, Phase 1 Liner Construction Addenda:
Sacramento County
Bid Due: 10/08/2026
Basic Information Title ASI Wellness Initiative, Project No: FL-2673 Agency CSU, Fullerton Department
State Government of California
Bid Due: 10/30/2026
Project Summary Project ID: BRC0000673 Project Name: Construction Manager at Risk Pre-Construction and
La County
Bid Due: 10/13/2026
Bid Solicitation # ANE127-AE-6504 Bid Solicitation # ANE127-AE-6504 Organization Name Architecture and Engineering
County of San Bernardino
Bid Due: 10/01/2026