| Location: | South Carolina |
|---|---|
| Posted: | Jan 13, 2026 |
| Due: | Feb 17, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | OJRSA #2024-08 / WK Dickson #20230904.00.CL (Phase II) |
| Publication URL: | To access bid details, please log in. |
Rehab of existing manholes and gravity sewer within OJRSA easements and other rights-of-way. Work consists of approx. 391 LF of 15” Cured-In-Place Pipe, 70 manhole rehabilitation using calcium aluminum cementitious liner system with epoxy, pressure grouting interior for leak prevention, replace/remove select frame/covers, select manhole cone/chimney replacement, and flow control/bypass pumping associated stream crossing, soil stabilization, dewatering and site restoration.

With GovernmentContracts, you can:
...Delivery Method: Design-Bid-Build Agency Project Coordinator: BLAKE BARBARE Email: BLAKE.BARBARE... of an engineering ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/17/2026
...School District One Anticipated Project Delivery Method: Design-Bid-Build Agency Project Coordinator... term Indefinite ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/07/2026
...of a conceptual design for the replacement new Miriam Brown Community Center. Full ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/06/2026
...: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Jamie Caggiano Email... Be ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/30/2026