| Location: | South Carolina |
|---|---|
| Posted: | Apr 22, 2026 |
| Due: | May 22, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FAA AIP# 3-45-0021-023/2024 |
| Publication URL: | To access bid details, please log in. |
The base bid covers pavement and taxiway edge lighting rehab on Parallel Taxiway A and two midfield connectors, including milling, leveling, geotextile installation, overlay, markings, shoulder grading, erosion control, and electrical upgrades. Additive Bids #1 and #2 involve milling, geotextile, overlay, and markings on the terminal and hangar aprons.

With GovernmentContracts, you can:
...preparation Structural fill of a perimeter berm Stone access road Erosion control measures ...
Greenville County
Bid Due: 11/16/2026
..., and erosion controls measures. Approximately 301,000 CY of excavation and 120,000 CY ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 11/16/2026
..., sediment and erosion control, grassing, and other miscellaneous and related items. Documents ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 11/05/2026