| Location: | South Carolina |
|---|---|
| Posted: | Apr 22, 2026 |
| Due: | May 22, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FAA AIP# 3-45-0021-023/2024 |
| Publication URL: | To access bid details, please log in. |
The base bid covers pavement and taxiway edge lighting rehab on Parallel Taxiway A and two midfield connectors, including milling, leveling, geotextile installation, overlay, markings, shoulder grading, erosion control, and electrical upgrades. Additive Bids #1 and #2 involve milling, geotextile, overlay, and markings on the terminal and hangar aprons.

With GovernmentContracts, you can:
...of full depth patching. Pavement markings are to include temporary, permanent, and accessibility... ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/07/2026
...B 6"/8"/10" CMRB Methods A & B Asphalt curb overlay Temporary and Thermoplastic ...
County of Spartanburg
Bid Due: 6/18/2026
...: 803-206-0055 Description: Project includes reconstructing and expanding apron pavement, plus parking... and ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/04/2026
...pavement markings and bike lanes to increase pedestrian safety Documents May Be Obtained ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/16/2026