JD Cope / 480V Low Voltage Motor Control Centers

Location: Georgia
Posted: Oct 28, 2026
Due: Nov 11, 2026
Agency: State Government of Georgia
Type of Government: State & Local
Category:
  • 61 - Electric Wire, and Power and Distribution Equipment
Solicitation No: PE-75553-NONST-2027-000000065
Publication URL: To access bid details, please log in.
Event ID Event Title Government Entity Start Date (ET) End Date (ET)
PE-75553-NONST-2027-000000065 JD Cope / 480V Low Voltage Motor Control Centers Dalton Utilities
Oct 28, 2026 @ 04:06 PM
Nov 11, 2026 @ 05:00 PM
JD Cope / 480V Low Voltage Motor Control Centers

Start Date: Oct 28, 2026 @ 04:06 PM ET

End Date:
Nov 11, 2026 @ 05:00 PM ET

Event ID: PE-75553-NONST-2027-000000065
Event Type: Non-State Agency
Event Status: Open
Purchase Type: Non-State Agency
Category Type: Goods
Government Type: city
Fiscal Year: 2027


Description


Dalton Utilities requests firm bids from qualified manufacturers and suppliers for the engineering, manufacture, testing, documentation, delivery, and specified field services for seven (7) indoor 480V motor control centers at the J.D. Cope Energy Facility. The attached Technical Specification 5.5330, Rev. B, including the equipment datasheets, governs the technical scope. All bids should be submitted electronically to dkeaton@dutil.com

NIGP Codes
Code Description
28567 Power Systems Switchgears and Related Accessories
28569 Misc. Electrical Equipment and Supplies (Not Otherwise Classified)
96737 Electrical and Electronic Products, Manufacturing Services
BuyerContact:

David Keaton
dkeaton@dutil.com

706-529-1202

Attachment Preview

Date Revision Issue Status Approved By
9/24/2026 A Issued For Owner Review JCR
10/26/2026 B Issued for Bid JCR

Dalton Utilities
J.D. Cope Energy Facility
Whitfield County, GA
BMCD PROJECT NO. 197347
BMCD Specification No. 5.5330
480V Motor Control Centers (MCCs)
Technical Specification
Date Revision Issue Status Approved
By
9/24/2026 A Issued For Owner Review JCR
10/26/2026 B Issued for Bid JCR

Dalton Utilities
J.D. Cope Energy Facility
5.5330 - 480V Motor Control Centers (MCCs)
Project No. 197347
Burns & McDonnell Engineering Company, Inc.
DOCUMENT 00 01 05 - INDEX AND CERTIFICATION PAGE
SPECIFICATION INDEX
DOCUMENT/ NUMBER
DIVISION DESCRIPTION OF PAGES
Division 01 General Requirements 35
Division 26 Electrical 27
00 01 05 - 1

SECTION 00 01 05 - INDEX AND CERTIFICATION PAGE: continued
I hereby certify that Division 01 and Division 26 were prepared by me or under my direct supervision and
that I am registered as a Professional Engineer under the laws of the State of Georgia.
Signature: _________________________
Typed or Printed Name:
Date: __________ Registration No.: ___________
00 01 05 - 2

Dalton Utilities
J.D. Cope Energy Facility
5.5330 - 480 V Motor Control Centers
Project No. 197347
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
Section 01 11 04 - Summary of Work
Appendix 01 11 04-A - General Design Conditions
Section 01 32 10 - Project Meetings, Schedules, and Reports
Section 01 33 04 - Submittals
Appendix 01 33 04-A - Submittal Schedule
Appendix 01 33 04-C - Cover and Spine Labels
Appendix 01 33 04-D - Hexagon SDX Submittal Instructions
Section 01 45 04 - Quality Control
Section 01 60 04 - Materials and Fabrication
Section 01 78 04 - Purchase Order Closeout
DIVISION 26 - ELECTRICAL
Section 26 00 02 - Electrical Equipment - General Technical Requirements
26 00 02_SW-1.0 - 600 Volt - Switchboard Wire
26 00 02_SW-1.1 - 600 Volt - Flexible Switchboard Wire
Section 26 24 19 - 480 Volt Motor Control Center Equipment
26 24 19-Datasheet - 480 Volt Motor Control Center Equipment Datasheet
REFERENCE DRAWINGS*
197347EE130.pdf Sh.1
197347EE130.pdf Sh.2
197347EE131.pdf
197347EE132.pdf
197347EE133.pdf
197347EE134.pdf
197347EE135.pdf
197347EE136.pdf
197347-SK-MCC-1.pdf
197347-SK-MCC-2.pdf
197347-SK-MCC-3.pdf
197347-SK-MCC-4.pdf
*Reference drawings are not included in the owner-review package and will be issued with the
bid documents.
END OF TABLE OF CONTENTS 00 01 10
00 01 10 - 1

SECTION 01 11 04 - SUMMARY OF WORK
PART 1 - GENERAL
1.01 SUMMARY:
A. The Project consists of a new electrical power generation plant utilizing 3 - 18.522MW
Reciprocating Engines totaling an output of 55.566MW.
B. Owner/Point of Delivery: 101 Looper Bridge Rd. SE Chatsworth, GA 30705.
C. Engineer: The Contract Documents were prepared by Burns & McDonnell Engineering
Company, Inc., (9400 Ward Parkway, Kansas City, Missouri 64114.)
D. Purchase Order Identification: 5.5330 - 480V Motor Control Centers (MCCs)
1.02 SCOPE:
A. The Work of this Purchase Order includes but is not limited to the following:
1. Design, fabricate, and deliver DDP, specified "Point of Delivery" seven (7) 480V MCCs
as required to meet the requirements defined in Purchase Order Documents.
2. All Work shall be designed to meet the design data specified in Appendix 01 11 04-A
Site Design Conditions and General Design Conditions.
3. Provide submittals per Appendix 01 33 04-A.
4. Provide submittals and Equipment Data Books as defined in Section 01 33 04.
5. Manufacturer Field Services as specified in Division 26.
6. Spare parts, special tools, lubricants, and consumables as specified in 1.3.
7. The Goods furnished under this Purchase Order shall be designed for indoor installation
and storage.
B. Conflicting Requirements: In the event that requirements specified within the technical
specification are found to be conflicting, Supplier shall notify Engineer before proceeding with
the work. In general, the following order of precedence shall be applied by the Supplier:
1. Technical Specification including all Equipment data sheets.
2. Other referenced industry codes/standards/specifications.
1.03 SPARE PARTS, SPECIAL TOOLS, LUBRICANTS AND CONSUMABLES:
A. Spare parts, special tools, hardware, lubricants, and other consumables required for complete
installation and commissioning shall be provided by Supplier. These shall be delivered to Site
with the Goods being provided under this Purchase Order.
B. Supplier shall provide a list of manufacturer's recommended spare parts for: 1) first two (2)
years of operation; 2) installation and commissioning; 3) capital spares (spares not subject to
wear).
1. These lists shall be included with Supplier's proposal and shall also be provided during
execution as a formal submittal.
2. Supplier shall provide one consolidated, organized Excel spreadsheet that contains all the
spare parts information for all Equipment provided. The necessary Excel headings shall
be as follows: Description, Size, Type, Design Pressure & Temperature, Design Class,
Design Material, End-to-End, End Prep, Rating, Packing No., Manufacturer, Purchaser
Order No., Vendor Name, Manufacturer Serial No, Model No., Drawing, Part No., ID
No., Exploded Drawing Numbers, Remarks, Rebuild Kit, Frame Size, RPM, Voltage,
Service Factor, Amps.
3. Unit Prices for spare parts shall be valid for purchase by Owner for two (2) years after
Substantial Completion.
C. Special tools which are required to maintain, inspect, disassemble, or operate the Materials
provided by the Supplier shall be provided by Supplier and will be turned over to Engineer
upon Substantial Completion. Examples include but are not limited to:
01 11 04 - 1
197347.5.5330

SECTION 01 11 04 - SUMMARY OF WORK: continued
1. Maintenance tools shall include lifting beams, non-standard wrenches including offset
wrenches, special slings and chokers, electrical breaker lifting and racking mechanisms,
rotor stands, bolt tensioning tools, temporary structural supports, specialized electronic
test equipment, and the like. All maintenance tools shall be in new and unused condition.
Maintenance tools shall be shipped in separate, heavily constructed wooden boxes
provided with hinged covers and padlock hasps. Maintenance tools for each piece of
Equipment shall be boxed separately and the boxes shall be clearly stenciled with the
name of the project, Supplier's Equipment Purchase Order number, and the name of the
Equipment. All boxed special maintenance tools shall be turned over to the Owner for
storage upon delivery to site.
2. If a tool is a required specialty tool, and the supplier supplying the Materials provides the
tool directly with the Materials or offers it as an accessory to assist in the installation,
inspection, operation, repair, or disassembly, then it shall be considered by the supplier as
a supplier-supplied part. The supplier shall include all special tools supplied by the
manufacturers required for installing the Equipment which is not normally furnished by
equipment erection subcontractors. One complete set of new, unused special tools shall
be furnished with the Equipment for use by the purchaser during construction. Erection
tools shall be shipped in separate, heavily constructed wooden boxes provided with
hinged covers and padlock hasps. Erection tools for each piece of Equipment shall be
boxed separately and the boxes shall be clearly stenciled with the name of the project,
purchaser's Purchase Order number, and the name of the Equipment. Erection tools shall
not be boxed with maintenance tools. After completion of the work, the purchaser shall
turn over all special erection tools to the owner as requested or that will be required for
owner's future maintenance.
1.04 WORK SEQUENCE
A. Sequence of Work shall be determined by Supplier to meet all Purchase Order requirements.
END OF SECTION 01 11 04
01 11 04 - 2
197347.5.5330

APPENDIX 01 11 04 A GENE RAL DESIGN PARAMETERS

APPENDIX 01 11 04 A GENERAL DESIGN PARAMETERS
1.01 FUNCTION:
A. Bidder shall use the criteria specified in this Section to develop the parameters and detailed
design necessary to specify, purchase, and supply equipment as specified to meet the
performance guarantees.
B. These criteria set the minimum standards acceptable. They are not intended to limit Bidder to a
single design approach.
C. The anticipated life that is required for Equipment and Materials furnished is 30 years.
Continuous operation will be required for the anticipated life with minimum scheduled
downtime for inspections and maintenance.
D. Materials specified are minimum requirements. Provide higher grade materials where required
to provide service life consistent with the life expectancy of utility power plant equipment and
structures.
E. General design criteria are specified in this Section. Additional design criteria for Equipment
and Materials are specified in other Sections.
1.02 APPLICABLE CODES AND STANDARDS:
A. Design in accordance with the following codes and standards:
1. Occupational Safety and Health Administration (OSHA)
2. International Building Code (IBC)
3. National Fire Protection Association (NFPA) Current Edition
4. National Electrical Code (NEC)
5. American Society of Mechanical Engineers (ASME)
6. American Society for Testing and Materials (ASTM)
7. American Water Works Association (AWWA)
8. Heat Exchange Institute (HEI)
9. Tubular Exchanger Manufacturer's Association (TEMA)
10. American National Standards Institute (ANSI)
11. Hydraulic Institute (HI)
12. Steel Structures Painting Council (SSPC)
13. Manufacturers Standardization Society (MSS)
14. Underwriters Laboratories, Inc. (UL)
15. FM Global
16. Pipe Fabrication Institute (PFI)
17. American Welding Society (AWS)
18. Midwest Insulation Contractors Association
19. American Gear Manufacturers Association (AGMA)
20. Plastic Pipe Institute (PPI)
21. International Organization for Standardization (ISO)
22. German Institute for Standardization (DIN)
23. International Electrotechnical Commission (IEC)
24. Institute of Electrical and Electronics Engineers (IEEE)
1.03 DESIGN PARAMETERS:
A. This article includes the basic Site/Project information and certain design criteria applicable to
the Project. This information is general in nature and may be additionally specified in other
Sections. In the event that additional specific information regarding the Project Site is
required, Bidder shall contact Engineer and Owner.
B. Site Conditions:
1. Ambient Conditions:
01 11 04-A - 1
197347.5.5330

APPENDIX 01 11 04 A GENE RAL DESIGN PARAMETERS
HVAC Design Conditions
Location Dalton, Georgia ASHRAE Weather Station # 722154
Ambient Design Conditions
Summer (F) Winter (F) 50 Year Extreme Conditions (F)
0.4%, DB/MCWB 1%, DB/MCWB 99.6%, DB 99%, DB Min, DB Max, DB Max, WB
93.2/ 75.4 91.1 / 74.8 19.7 23.5 1.7 101.9 89.4
Dehumidification (F)
0.4%, DP/HR/MCDB 1%, DP/HR/MCDB4
77.4 / 146.4/ 83.7 75.3 / 136.1 / 82.6
HVAC Design Parameters
Building/Room Type Indoor Design Temperatures3 Outdoor Design Conditions System Type
Summer, F Winter, F Summer Winter
Occupied Areas
Offices (Admin) 2 78 70 1% 99% HVAC
Laboratories2
Critical Control Room2 77 70 Extreme Extreme HVAC
Equipment Areas, Unoccupied
Engine Hall 122 45 0.4% 99.6% HV
Mechanical Rooms4 110 110 45 0.4% 99.6% HV
Tank Building4 45 0.4% 99.6% HV
Battery Rooms1 77 77 0.4% 99.6% HVAC
Critical Elec. 77 70 Extreme Extreme HVAC
1 1% & 2% Hydrogen alarms, Dual Setpoint. 2 Design maximum relative humidity 65% at 1% Summer MCWB. 3 Indoor design temperature based on associated outdoor design conditions. 4 Design relative humidity is 30%.

APPENDIX 01 11 04 A GENERAL DESIGN PARAMETERS
a. Site Elevation: 710 feet Above Mean Sea Level.
b. Barometric Pressure: 14.11 psi-a
2. HVAC Design Criteria:
HVAC Design Conditions
Location Dalton, Georgia ASHRAE Weather Station # 722154
Ambient Design Conditions
Summer (F) Winter (F) 50 Year Extreme Conditions (F)
0.4%, 99%, DB Max,
1%, DB/MCWB 99.6%, DB Min, DB Max, DB
DB/MCWB WB
93.2/ 75.4 91.1 / 74.8 19.7 23.5 1.7 101.9 89.4
Dehumidification (F)
0.4%, 1%,
DP/HR/MCDB DP/HR/MCDB4
77.4 / 146.4/
83.7 75.3 / 136.1 / 82.6
HVAC Design Parameters
Indoor Design Outdoor Design
Temperatures3 Conditions System
Winter, F Type
Building/Room Type Summer, F Summer Winter
Occupied Areas
Offices (Admin) 2
78 70 1% 99% HVAC
Laboratories2
Critical Control
77 70 Extreme Extreme HVAC
Room2
Equipment Areas, Unoccupied
Engine Hall 122 45 0.4% 99.6% HV
110 45 0.4% 99.6% HV
Mechanical Rooms4
110 45 0.4% 99.6% HV
Tank Building4
Battery Rooms1 77 77 0.4% 99.6% HVAC
Critical Elec. 77 70 Extreme Extreme HVAC
1 1% & 2% Hydrogen alarms, Dual Setpoint.
2 Design maximum relative humidity 65% at 1% Summer MCWB.
3 Indoor design temperature based on associated outdoor design conditions.
4 Design relative humidity is 30%.
3. HVAC Design Criteria:
a. Extreme Ambient Dry Bulb Temperature:
(1) Maximum: 101.9 degreesF.
(2) Minimum: 1.7 degreesF.
(3) Minimum Design Metal Temperature (MDMT): 0 degreesF.
(4) Equipment located outdoors shall be designed for these extreme ambient dry
bulb and MDMT temperatures.
b. Rainfall:
(1) Annual Average: 56 inches.
01 11 04-A - 2
197347.5.5330

APPENDIX 01 11 04 A GENE RAL DESIGN PARAMETERS

APPENDIX 01 11 04 A GENERAL DESIGN PARAMETERS
(2) 100-year, 24-hour total: 7.65 inches
c. Seismic Design shall be in accordance with the International Building Code, 2024
Edition, with Georgia Amendments.
(1) Risk Category: III
(2) Site Class: D
(3) Seismic Design Category: C
(4) Seismic Importance Factor: 1.25
(5) Spectral Response Acceleration at Short Period, S : 0.51g
S
(6) Spectral Response Acceleration at 1-Second Period, S : 0.12g
1
d. Wind Design shall be in accordance with the Georgia Building Code and the
following:
(1) Risk Category: III
(2) Basic Design Wind Speed: 112 mph
(3) Exposure Category: C
e. Snow Loading shall be in accordance with the Georgia Building Code and the
following:
(1) Risk Category: III
(2) Ground Snow Load: 29 psf
(3) Terrain Category: C
(4) Snow Importance Factor: 1.1
f. Site Frost Depth 5 inches
4. Equipment and Materials for the Project shall comply with the OSHA Regulations and
Standards 29CFR1910. All Work performed on Site shall comply with OSHA
Regulations and Standards 29CFR1926 and 29CFR1926 Subpart R.
5. Equipment Sound Level Requirements: The maximum A-weighted sound level for
Equipment furnished under these Specifications shall not exceed 85 dBA free field
measured 3 feet horizontally from the base of the Equipment and 5 feet above floor level
or any personnel platforms under any normal operating condition. In addition, provide
sound level for all octave bands for each Equipment furnished. During re-pressurization,
the dryer will exceed 85 dBA for several seconds and is considered an abnormal
condition.
6. Asbestos material is strictly prohibited in the Equipment furnished under this Purchase
Order.
7. Coating/Painting:
a. Unless specified more explicitly in the technical specifications, all Equipment shall
be factory finish painted with system suitable for the intended final service
conditions and environment at the Project Site without any additional field painting
for a reasonable design and operating service life of no less than 10 years. All
equipment provided shall include manufacturer's standard surface preparation and
coating system.
b. Submit all factory finish painting information (surface preparation, number of
coats, thickness of each coat, general type and manufacturer's product
name/number of each coat, topcoat color name/number, and other applicable
information) for information and Owner's future use.
8. Standards of Design and Workmanship:
a. The finished Work and/or product shall be complete in all respects. All hardware
shall be manufactured, fabricated, assembled, finished, and documented with the
workmanship of the highest quality throughout, and all of the components shall be
new.
01 11 04-A - 3
197347.5.5330

APPENDIX 01 11 04 A GENE RAL DESIGN PARAMETERS

APPENDIX 01 11 04 A GENERAL DESIGN PARAMETERS
b. The Work shall be carried out in accordance with Best Recognized Practices and
customary industry quality unless otherwise specified within the technical
specification Sections.
01 11 04-A - 4
197347.5.5330

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-29016-NONST-2027-000000078

State Government of Georgia

Bid Due: 11/19/2026

Bid Number: #66812-27-0007 Bid Title: ITB - FY27 City of Douglas 2 REELS

Douglas city

Bid Due: 11/17/2026

Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-66812-NONST-2027-000000082

State Government of Georgia

Bid Due: 11/17/2026

Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-66096-NONST-2026-000000220

State Government of Georgia

Bid Due: 11/24/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.