Bid Solicitation: S-KS2410-00014221
|
|
Responses Due in 34 Days, 17 Hours, 21 Minutes
|
|
Header Information
|
|
Bid Number:
|
S-KS2410-00014221
|
Description:
|
Architectural Engineer
|
Bid Opening Date:
|
07/31/2025 10:00:00 AM
|
|
Purchaser:
|
Kim Leeker
|
Organization:
|
Salem Area Mass Transit District-Cherriots
|
|
Department:
|
KS241001 - Procurement
|
Location:
|
KS241 - Procurement
|
|
Fiscal Year:
|
25
|
Allow Electronic Quote:
|
Yes
|
|
Alternate Id:
|
|
Required Date:
|
|
Available Date
:
|
06/26/2025 08:46:36 AM
|
|
Info Contact:
|
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
|
Purchase Method:
|
Open Market
|
|
Pre Bid Conference:
|
7/10/2025
See section 3.A Procurement Schedule
|
|
Bulletin Desc:
|
This East Salem Transit Center (ESTC) project will have three phases. The planning phase of the project will entail an architectural or engineering firm to complete a site selection study, which will include mobility integration elements and first/last mile micromobility options. Future phases will include property acquisition, engineering and architectural design, and construction of the East Salem Transit Center (ESTC).
|
|
|
Ship-to Address:
|
Charleen McCurdy
555 Court St. NE, Suite 5230
Salem, OR 97301
US
Email: charleen.mccurdy@cherriots.org
Phone: (503) 361-7523
|
Bill-to Address:
|
Charleen McCurdy
555 Court St. NE, Suite 5230
Salem, OR 97301
US
Email: charleen.mccurdy@cherriots.org
Phone: (503) 361-7523
|
Print Format:
|
Bid Print New
|
File Attachments:
|
ESTC RFP
Price Proposal
|
Form Attachments:
|
|
|
Required Quote Attachments
|
|
|
Discipline Type:
|
A and E Related Services
|
Procurement Method:
|
Competitive Sealed Proposal
|
|
Item # 1:
(
906
-
25
)
|
This East Salem Transit Center (ESTC) project will have three phases. The planning phase of the project will entail an architectural or engineering firm to complete a site selection study, which will include mobility integration elements and first/last mile micromobility options. Future phases will include property acquisition, engineering and architectural design, and construction of the East Salem Transit Center (ESTC). Much like the Keizer and South Salem Transit Centers, the ESTC will be ADA compliant and designed to accommodate convenient and efficient multimodal connections. This project will include bus bays, digital information displays, a transit operator breakroom with a restroom, a security office, and a space for maintenance storage. Bicycle parking, integrated access to the college and local streets, bus shelters, solar power generation, onsite stormwater treatment, security cameras, landscaping, and passenger platforms, benches, and trash receptacles must all be included.
|
|
NIGP Code:
|
906-25
Design Build, Architectural Services
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 2:
(
907
-
75
)
|
This East Salem Transit Center (ESTC) project will have three phases. The planning phase of the project will entail an architectural or engineering firm to complete a site selection study, which will include mobility integration elements and first/last mile micromobility options. Future phases will include property acquisition, engineering and architectural design, and construction of the East Salem Transit Center (ESTC). Much like the Keizer and South Salem Transit Centers, the ESTC will be ADA compliant and designed to accommodate convenient and efficient multimodal connections. This project will include bus bays, digital information displays, a transit operator breakroom with a restroom, a security office, and a space for maintenance storage. Bicycle parking, integrated access to the college and local streets, bus shelters, solar power generation, onsite stormwater treatment, security cameras, landscaping, and passenger platforms, benches, and trash receptacles must all be included.
|
|
NIGP Code:
|
907-75
Site Assessment and Site Field Observation
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
|
|
OREGON_OREGON_AWS_PROD_BUYSPEED_2_bso
|
|