| Location: | California |
|---|---|
| Posted: | Nov 15, 2024 |
| Due: | Dec 4, 2024 |
| Agency: | City of Redwood |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | ENG24-18 |
| Publication URL: | To access bid details, please log in. |
The City of Redwood City is soliciting bids for the 2024 Pavement Overlay Project - Redwood Avenue (El Camino Real to Valota Rd)
The work of this project consists generally of: without limitation, asphalt concrete grinding, area repairs, and overlay; asphalt concrete speed cushions; utility cover adjustments; traffic signage and striping; temporary traffic control; stormwater pollution protection. Work shall be completed within 90 Calendar Days from the date when Contract Time commences to run.
Contract Documents and bidding information can be found HERE .

With GovernmentContracts, you can:
...control, demolition, earthwork and grading, minor concrete (curbs, sidewalks, and gutters) , AC ...
City of Turlock
Bid Due: 6/17/2026
...control, demolition, earthwork and grading, minor concrete (curbs, sidewalks, and gutters) , AC ...
City of Turlock
Bid Due: 6/17/2026
...grinding and paving; removal of existing sidewalk, curb & gutter, and curb ramps ...
City of Redwood
Bid Due: 6/17/2026
...consists of pavement repairs, rehabilitation, and overlays, including: 1.1 Grinding and replacing... all ...
Town of Atherton
Bid Due: 6/25/2026