| Location: | North Carolina |
|---|---|
| Posted: | Jul 6, 2026 |
| Due: | Aug 6, 2026 |
| Agency: | State Government of North Carolina |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 274-ES 2024-01 |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | 274-ES 2024-01 |
| Project Title: | Complete Streets Group 3 |
| Description: | Paving, curb ramp upgrades, signing, pavement markings, and signal modifications on Martin Luther King Jr Boulevard between S East Street and S State Street; Paving, curb ramp upgrades, signing, pavement markings, and signal modifications on Harrington Street and West Street between West Hargett Street and W Johnson Street; Sidewalk installation, curb ramp upgrades, retaining wall construction, signing, and pavement markings on E Cabarrus Street between S East Street and S Swain Street. |
| Opening Date: | 8/6/2026 2:30 PM |
| Posted Date: | 7/7/2026 |
| Status: | Open |
| Department: | CITY OF RALEIGH |

With GovernmentContracts, you can:
...disturbed by construction. The City may also authorize optional paving and parking lot ...
State Government of North Carolina
Bid Due: 9/30/2026
...51307 POC 51307 - PROPOSED CONSTRUCTION OF A PARKING LOT AND MULTI-USE TRAIL ...
Division of Highways
Bid Due: 9/23/2026
...DB00646 POC GRADING, DRAINAGE, PAVING, AND STRUCTURE OF BRIDGE 60131 OVER OLD MILL ...
Division of Highways
Bid Due: 9/23/2026
...restoration and repaving of areas disturbed by construction. The City may also authorize ...
Lexington city
Bid Due: 9/30/2026