| Location: | West Virginia |
|---|---|
| Posted: | Dec 19, 2025 |
| Due: | Jan 13, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W911WN26BA003 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The U.S. Army Corps of Engineers (USACE), Pittsburgh District, is carrying out a Project at Pike Island Locks and Dam, Ohio River, Belmont County, West Virginia. The work is located on both the Main Lock Chamber and the Auxiliary Lock Chamber, downstream of each of the downstream miter gates at the poiree dam location. The site of the work may be reached from state and local roads and streets, however, floating plant support may be required for some features of work. The general description of the work is to furnish all equipment, labor, layout of work, and supervision to prepare the site for future installation of downstream bulkhead recesses by others. This work includes coring holes in the concrete, wiresawing of concrete, on both the vertical and horizontal faces of the lock monoliths, to the extent shown in the plans. Portions of this work will occur underwater. Concrete coring work will be performed in the 110-FT by 1200-FT main lock chamber, and the 110-FT by 600 FT auxiliary lock chamber, specifically at the monoliths adjacent to the Poiree dam sill. The work will involve both vertical and horizontal coring of concrete. In addition to concrete coring, concrete wiresawing work will be performed in the 110-FT by 600-FT auxiliary lock chamber only, at the location where the concrete coring was executed. The work will involve both vertical and horizontal sawing of concrete.
NOTICE: Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on “View FFP Contract Changes Playbook Here”.
19 December 2025 - Organized pre-bid site visit conducted on 17 December 2025. Contracting discussion and site visit sign in posted.
| Oct 29, 2025 | [Presolicitation (Original)] Pike Island Locks and Dam Bulkhead Slot Coring and Wiresawing |
| Oct 30, 2025 | [Presolicitation (Updated)] Pike Island Locks and Dam Bulkhead Slot Coring and Wiresawing |
| Dec 10, 2025 | [Solicitation (Original)] Pike Island Locks and Dam Bulkhead Slot Coring and Wiresawing |
| Jan 6, 2026 | [Solicitation (Updated)] Pike Island Locks and Dam Bulkhead Slot Coring and Wiresawing |
| Jan 15, 2026 | [Solicitation (Updated)] Bulkhead Slot Coring and Wiresawing for Pike Island Locks and Dam |
| Jan 21, 2026 | [Solicitation (Updated)] Bulkhead Slot Coring and Wiresawing for Pike Island Locks and Dam |

With GovernmentContracts, you can:
Description: Building 31 & 35 Mechanical, Elevator, and Facade Repairs Department: GENERAL SERVICES
State of West Virginia
Bid Due: 6/18/2026
Follow Firearms Mounted Sighting Systems (Optics) Active Contract Opportunity Notice ID 70B06C26R00000072 Related
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 6/12/2026
Follow Hangar Fire Alarm System Active Contract Opportunity Notice ID W50S9J-26-B-A010 Related Notice
DEPT OF DEFENSE
Bid Due: 6/16/2026
Description: Building 31 & 35 Mechanical, Elevator, and Facade Repairs Department: GENERAL SERVICES
State of West Virginia
Bid Due: 6/18/2026