| Location: | Georgia |
|---|---|
| Posted: | Oct 26, 2025 |
| Due: | Dec 11, 2025 |
| Agency: | Forsyth County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-97-3320 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Forsyth County Board of Commissioners is soliciting proposals from qualified firms to provide Construction services for the Forsyth County – Antioch Water Treatment Plant (WTP) Emergency Backup Generator under a Progressive Design-Build Agreement. The project includes the following major components:
1) Significant cutting, off site hauling and disposal of spoil material, and regrading of the existing soil pile covering the majority of the planned generator facility.
2) Site drainage and stormwater management improvements needed to accommodate the additional impervious surface created as result of this project.
3) Permitting of the work as required.
4) Coordination with Georgia Power for the installation of the new service entrance.
5) One 2500kW, 12.47kV generator at the electric utility service point; it is anticipated the generator will operate 18MGD of conventional filters and 6MGD of membrane process trains (total 24 MGD) and two 700 HP high service pumps (4.16kV, 9 MGD capacity each, for 18 MGD total of pumping capacity). The design builders engineer will coordinate with owner to identify load shed scheme and determine what will happen when plant is on generator power.
6) New medium voltage generator bus and new service entrance equipment housed in a new electrical building.
7) The site layout will be sized to accommodate two additional future generators, providing a 7500kW backup supply for the ultimate plant capacity per the facility master plan.
8) New electrical building will require new paved driveway access.
9) Commissioning and start-up of the new facilities.
Mandatory Pre-Proposal Meeting: 2:00 pm on Monday, November 10, 2025 at the Antioch WTP located at 2255 Antioch Road, Cumming Georgia 30040.

With GovernmentContracts, you can:
...AWTP-(2) 1000 Hp Reservoir Vertical Turbine Macon Water Authority Oct 02, 2026 @ ...
State Government of Georgia
Bid Due: 11/17/2026
...AWTP-(2) 1000 Hp Reservoir Vertical Turbine The Project consists of furnishing all labor..., ...
Macon Water Authority
Bid Due: 11/17/2026
...________________________________________ MEET SPECS * Diesel engine "yes "no * Gross engine HP 47 ...
City of Ringgold
Bid Due: 11/04/2026
...80 PVC force main, +-60 LF of 2" PE Force Main, and a ...
State Government of Georgia
Bid Due: 11/12/2026