| Location: | North Carolina |
|---|---|
| Posted: | Nov 9, 2026 |
| Due: | Nov 17, 2026 |
| Agency: | City of Charlotte |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FY27-ITBCON-31 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Ashe Plantation Lift Station project involves the design, bidding, and construction of a new lift station utilizing the existing wet well built during Phase I of the Ashe Plantation Wastewater Treatment Plant. The proposed system is a duplex lift station with a capacity of 320 gallons per minute, which will connect to an 8-inch forcemain. This new infrastructure will convey wastewater to the Goose Creek basin. As part of the project, the existing package treatment plant will be decommissioned.

With GovernmentContracts, you can:
Follow Z2DA--FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009) Active
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 12/09/2026
Designer Solicitations - George Watts Hill Alumni Center Renovation and Addition By kiabell
University of North Carolina
Bid Due: 11/19/2026
2nd STREET GARAGE ELEVATOR MODERNIZATION Reference number: ITB-S1-11026 Closing date: December 03, 2026,
City of Wilmington
Bid Due: 12/03/2026
Project: Mint Museum Randolph Roof Repair Project - Phase II Ref. #: 269-2027-043
City of Charlotte
Bid Due: 12/08/2026