| Location: | North Carolina |
|---|---|
| Posted: | Mar 19, 2025 |
| Due: | Apr 17, 2025 |
| Agency: | State Government of North Carolina |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 274-ESIFS-LIONSHVAC-2025 |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | 274-ESIFS-LIONSHVAC-2025 |
| Project Title: | Lions Park – HVAC Replacement |
| Description: | 1. Remove and replace existing 30-ton split system dx cooling and hot water heat air handler and condensing unit. 2. Replace existing outdoor boiler with new 500 MBH outdoor boiler. 3. Provide new pumps, VFD’s, ductwork and piping inside of mechanical room. 4. Clean existing ductwork outside of mechanical room. 5. Provide pre-construction and post-construction test and balance. 6. Control new system via new controllers and new jace. 7. Add Alternate #1: Replace all medium pressure ductwork up to existing VAV terminals. 8. Add Alternate #2: Replace all medium pressure ductwork and replace existing VAV terminals. Replace all existing hot water piping. |
| Opening Date: | 4/17/2025 1:00 PM |
| Posted Date: | 3/20/2025 |
| Status: | Open |
| Department: | CITY OF RALEIGH |
|
Solicitation Number
*
274-ESIFS-LIONSHVAC-2025
|
Department
CITY OF RALEIGH
|
Status Reason
Open
|
|
|
Opening Date
2025-04-17T13:00:00.0000000
|
Posted Date
*
2025-03-19T18:16:35.0000000Z
|
Commodity Code
Distribution and conditioning system equipment maintenance and repair services
|
|
|
Mandatory Conference/Site Visit
2025-04-01T04:00:00.0000000Z
|
Special Instructions
Contact: glen.willert@raleighnc.gov
|
||
|
Description
1. Remove and replace existing 30-ton split system dx cooling and hot water heat air handler and condensing unit. 2. Replace existing outdoor boiler with new 500 MBH outdoor boiler. 3. Provide new pumps, VFD’s, ductwork and piping inside of mechanical room. 4. Clean existing ductwork outside of mechanical room. 5. Provide pre-construction and post-construction test and balance. 6. Control new system via new controllers and new jace. 7. Add Alternate #1: Replace all medium pressure ductwork up to existing VAV terminals. 8. Add Alternate #2: Replace all medium pressure ductwork and replace existing VAV terminals. Replace all existing hot water piping.
|
|||
|
Attachments
|
|||

With GovernmentContracts, you can: