| Location: | Texas |
|---|---|
| Posted: | Jul 7, 2026 |
| Due: | Jul 17, 2026 |
| Agency: | City of Dallas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | CIZ-DWU 26 019 |
| Publication URL: | To access bid details, please log in. |
Project Description: The project consists of the construction of a new residuals bypass pipeline, mechanical upgrades to the Sludge Pump Station, installation of variable frequency drives, a new electrical building with a motor control center (MCC), HVAC improvements, and replacement of the site transformer. Additional improvements include new flowmeter controls, irrigation and landscaping enhancements, and security upgrades at the North Berry Road gate. Modifications to the existing clearwells are also included as additive alternates. Volumes 1, 2, & 3 Specifications, Drawings, and Bid Proposal Spreadsheet will be uploaded Friday May 29, 2026.

With GovernmentContracts, you can:
...: Inverted V design to reduce stress MOTOR TYPE: Electric motor; MOTOR POWER: ...
DEPT OF DEFENSE
Bid Due: 7/27/2026
...and hardwiring a disconnect at each motor, piping conduit for the control switches ...
DEPT OF DEFENSE
Bid Due: 7/27/2026