| Location: | Texas |
|---|---|
| Posted: | Jul 7, 2026 |
| Due: | Jul 17, 2026 |
| Agency: | City of Dallas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | CIZ-DWU 26 019 |
| Publication URL: | To access bid details, please log in. |
Project Description: The project consists of the construction of a new residuals bypass pipeline, mechanical upgrades to the Sludge Pump Station, installation of variable frequency drives, a new electrical building with a motor control center (MCC), HVAC improvements, and replacement of the site transformer. Additional improvements include new flowmeter controls, irrigation and landscaping enhancements, and security upgrades at the North Berry Road gate. Modifications to the existing clearwells are also included as additive alternates. Volumes 1, 2, & 3 Specifications, Drawings, and Bid Proposal Spreadsheet will be uploaded Friday May 29, 2026.

With GovernmentContracts, you can:
...Project: Mount Carmel Water Treatment Plant Vertical Turbine Pump #7 Installation Ref. #: ...
City of Waco
Bid Due: 8/06/2026
...Mount Carmel Water Treatment Plant Vertical Turbine Pump #7 Installation Follow Solicitation.../Item Code: ...
State Government of Texas
Bid Due: 8/06/2026
...a complete turnkey fuel station system for Port operations. The project includes the ...
Port of Galveston
Bid Due: 7/23/2026
...MISSION INSTALLATION CONTRACTING COMMAND Sub Command 3 419TH CSB Office W6QM MICC-FT DRUM ...
DEPT OF DEFENSE
Bid Due: 7/22/2026