| Location: | Federal |
|---|---|
| Posted: | Sep 9, 2024 |
| Due: | Oct 31, 2024 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | PAN24P004570 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
General. This is a SOURCES SOUGHT and is for informational/market research purposes only. THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION OR BID, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER FAR SUBPART 5.2.
This Sources Sought is to gain knowledge of the interest, capabilities, and qualifications of industry so the government can make informed business decisions. We are seeking responses from both large and small business members of industry to include: Small Business, Small Disadvantaged Businesses to include 8(a) firms, Historically Underutilized Business Zones (HUBZone), Woman-Owned Small Business (WOSB) to include Economically Disadvantaged Women-Owned Small Business (EDWOSB), Service-Disabled Veteran-Owned Small business (SDVOSB) and Veteran Owned Small Business (VOSB). All interested parties are highly encouraged to respond.
Reponses to this Sources Sought announcement will be used by the Government to make business decisions and to inform potential future solicitations.
The North American Industrial Classification Code (NAICS) for this requirement is: 237990 – Other Heavy and Civil Engineering Construction. The related size standard is: $45 million.
The Product Service Code (PSC) for this requirement is: Z2KA – Repairs or Alteration of Dams
Formal Sources Sought Response due – 31 October 2024 at 3:00 pm Pacific Time.
Project Background. Rock has been migrating into the Bonneville Dam spillway stilling basin which causes damage to the concrete and requires non-routine rock removal on a semi-annual basis. USACE has determined that constructing two concrete structures on the spillway apron will prevent rock from migrating to the middle of the spillway and jumping into the stilling basin. It’s anticipated that rock will accumulate against these structures and can be removed with routine flushing spills.
Project Scope. The scope of this project includes constructing two concrete barriers on the spillway apron. The barriers will be approximately 17-ft tall x 13-ft wide x 80-ft long and will be constructed of pre-cast concrete hollow cell blocks. The pre-cast blocks will be formed and backfilled with tremie concrete. All construction will be done in the wet up to 40 feet below the water surface. The in-water-work period for this project is November 1 through February 28. The major features of work include pre-cast concrete block construction, underwater formwork and concrete placement, and rock removal from the spillway apron and stilling basin.
The following information represents the project objectives:
Anticipated Construction Schedule: CENWP intends to advertise (May 2025) and award (September 2025) Construction Contract with estimated construction completion by the end of calendar year 2026.
Estimated Construction Cost (ECC): The current ECC is more than $10,000,000. Ref. FAR 36.204 Disclosure of Magnitude and DFARS 236.204 Disclosure of Magnitude.
Number and Type of Contracts: NWP contemplates awarding one (1) Firm-Fixed Price Construction Contract. The acquisition strategy decision has not yet been determined. Maximum Small business participation is being sought at both the Prime and subcontracting levels.
Anticipated Source Selection Process: The expected method to determine the best value to the government is Best Value Trade Off (BVTO).
Project Specific Constraints and Challenges:
Questions for Industry:
Submission Instructions. Formal responses to this Sources Sought notice must be submitted electronically (via email) with SUBJECT: Sources Sought – PANNWD-24-P-0000 004570 Bonneville Spillway Rock Mitigation. Please email to Andrea Smothers, Contracting Officer, at Andrea.K.Smothers@usace.army.mil and Kristel Flores, Contracting Specialist, at Kristel.M.Flores@usace.army.mil, before 3:00 pm Pacific Time on 31 October 2024.
Interested parties’ responses to this Sources Sought shall be limited to six (6) pages and should include the following information:
The Government may verify information in CPARS or PPIRS.
Disclaimer and Important Notes.
Attachments.
Draft Plans & Specifications

With GovernmentContracts, you can:
...Follow LD7 Slab Concrete Leveling Repair Active Contract Opportunity Notice ID W912ES26QA064... Exterior ...
DEPT OF DEFENSE
Bid Due: 7/02/2026
...to partial removal and disposal of an existing concrete dam and headgate structure ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 7/08/2026