Project ID: E1302-25S
Title: Professional Engineering Services for the American Martyrs Stormwater Sump Hydrology and Capacity Study
Addenda: 0
Release Date: 11/26/2025
Due Date: 12/18/2025
The City of Manhattan Beach (“City”) invites sealed proposals on the project described herein to be submitted via OpenGov. Proposals will be received until 10:00 am on Thursday, December 18, 2025 .
Bid Valid: 120 Days
Anticipated Start: March 2026
Anticipated Completion: July 2026 or sooner
Anticipated Schedule:
|
ACTION |
DATE |
|
NON-mandatory Pre-Proposal Meeting |
12/8/2025 at 10:00 AM |
|
Last Day to Submit Questions |
12/10/2025 at 10:00 AM |
|
Proposal Submission Deadline (OpenGov ONLY) |
12/18/2025 at 10:00 AM |
|
Staff Review of Proposals |
12/18/2025 through 12/31/2025 |
|
Interview(s) with Top Ranked Consultant(s) and City Negotiations – ( If Needed ) |
TBD |
|
City Council Award |
February 2026 |
|
Contract Execution |
February 2026 |
|
Notice To Proceed |
March 2026 |
Single Point of Contact for Questions
All questions must be submitted through OpenGov on the website provided in Section 1, Instructions to Proposers. Proposers may not contact any other staff members with questions.
OPTIONAL Pre-Proposal Meeting is scheduled for Monday, December 08, 2025, at 10:00 a.m. at the southwest corner of the American Martyrs School site located at 721 15 th Street, Manhattan Beach, CA 90266. See Appendix E for Location Map.
Project Description
The City seeks a Consultant to perform professional engineering services for the American Martyrs Stormwater Sump Hydrology and Capacity Study. The Consultant shall communicate their review and findings for the area as per their expertise, make minor and major recommendations for drainage improvements and long-term resiliency, create conceptual diagrams, as well as provide probable costs and schedule. The final deliverable will be an assessment report outlining the recommendations for any deficiencies unfit per the latest standards, codes, and requirements of all applicable agencies.
The selected Consultant may be utilized for design development following the completion of the report if the City elects to proceed with a recommendation; however, this will depend on performance and additional contract approval, and is not guaranteed.
Project Area
The project’s address is 721 15 th Street, Manhattan Beach, CA. Refer to Appendix E for Location Map. The American Martyr’s Sump is located directly adjacent to American Martyrs School and is situated in a localized low point, where stormwater runoff from the adjacent developed areas is transferred to the sump.
Project Background
On occasion during periods of heavy stormwater runoff, American Martyr’s Sump capacity has overflowed and encroached into the adjacent school play and building areas. In 1999, a hydrology report (Appendix F) was created which calculated peak flow, volume of runoff for three storm periods (including Los Angeles County Department of Public Works criteria), and presented four possible solutions for remediation. The hydrologic method was able to identify the 50-year, 4-day storm as the leading design plan for recommendations lowering the risk of flood damage.
The study analyzed infiltration rates and options for gravity systems, a pump station, and discharge directly to the ocean via a new underground storm drain system. The California Coastal Commission, Los Angeles County Department of Public Works, and California Regional Water Quality Control Board all expressed concern for protection of marine life, health, water quality, stormwater treatment, necessary clearances, and permits if water would not be retained. For these reasons, and the fact that the existing sump was determined to percolate with reasonable efficiency at the time, it was recommended to City Council that no further action be taken regarding the American Martyrs stormwater sump.
Stormwater has flooded adjacent areas again, indicating that the sump’s capacity and/or infiltration rates may no longer be sufficient. With changes that occur due to the environment, rainfall, agency requirements, and overall hydrology over the years, an update to the 1999 hydrology report is necessary to verify the required sump capacity and to propose drainage options and maintenance protocol along with their associated costs.

With GovernmentContracts, you can:
...Category A: Freeway Operations, Data Analytics and Performance Assessments to apply...
Association of Bay Area Governments
Bid Due: 6/30/2026
...Follow Aviation Climate Assessment Survey System (ACASS) Services Active Contract Opportunity... NAICS Code: ...
DEPT OF DEFENSE
Bid Due: 6/10/2026
...performance audit consulting services to support the City's Internal Audit Division. The City ...
City of Pasadena
Bid Due: 7/07/2026
...report by providing technical evaluation, feasibility assessment, and empirical evidence to inform..., recognizing ...
State Government of California
Bid Due: 7/14/2026