| Location: | Georgia |
|---|---|
| Posted: | Jul 10, 2026 |
| Due: | Aug 11, 2026 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-62250-NONST-2027-000000015 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-62250-NONST-2027-000000015 | JOHNSON AVE STORMWATER & STREETSCAPE | Carrollton, City Of |
Jul 10, 2026 @ 03:41 PM
|
Aug 11, 2026 @ 10:00 AM
|
Start Date: Jul 10, 2026 @ 03:41 PM ET
End Date:
Aug 11, 2026 @ 10:00 AM ET
The project consists of reconstructing Johnson Avenue and associated utilities from Rome Street to Barnes Avenue and on Barnes Avenue from Johnson Avenue north approximately 250 feet. The project will include installation of new 18''-60'' storm sewer piping and drainage structures; new 8'' sanitary sewer main piping and manholes; new 8'' and 12'' water mains; reconnecting sanitary sewer and water services; relocation of existing utilities where necessary; saw-cutting and demolition of existing road and parking lots; milling and overlay portions of existing road; new full-depth pavement and curb and gutter for road and parking lots; new sidewalks; installation of a retaining wall; re-striping and re-signing roadway and parking lots; traffic control; erosion control (installation, maintenance, and removal); and permanent stabilization. The Contractor is expected to coordinate utility relocations with the City Engineer and Utility Owner(s). The City of Carrollton anticipates that the roads and adjacent parking lots will be partially and fully closed during certain phases of construction, but closure of the roads and parking lots will need to be kept to a minimum. The Contractor is expected to coordinate all lane/road/parking lot closures necessary throughout construction with the City Engineer. The Contractor will be required to maintain good communication and coordination with the Project Engineer and the City Engineer throughout construction of the project.
| Code | Description |
| 91345 | Construction, Sewer and Storm Drain |
Dalton Appleby
dappleby@carrollton-ga.gov
(770) 830-2000

With GovernmentContracts, you can:
...Project: Sewer Flow Monitoring Services Ref. #: 27-19-3320 Type: RFP Status: Open Open ...
Forsyth County
Bid Due: 10/15/2026
...27-050 Red Hot Sewer Solvent Available Date: 9/15/2026 Due Date: 10/5/2026 no later ...
https://www.augustaga.gov/
Bid Due: 10/05/2026
...Project ID: 26-7009 Title: Cleaning of Manholes, Sewer Lines, and Drains Addenda: 0 ...
Cobb County
Bid Due: 9/24/2026
...Downtown Franklin Water and Sewer Project Heard County Water Authority Aug 17, 2026 ...
State Government of Georgia
Bid Due: 10/09/2026