| Location: | Georgia |
|---|---|
| Posted: | Jul 10, 2026 |
| Due: | Aug 11, 2026 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-62250-NONST-2027-000000015 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-62250-NONST-2027-000000015 | JOHNSON AVE STORMWATER & STREETSCAPE | Carrollton, City Of |
Jul 10, 2026 @ 03:41 PM
|
Aug 11, 2026 @ 10:00 AM
|
Start Date: Jul 10, 2026 @ 03:41 PM ET
End Date:
Aug 11, 2026 @ 10:00 AM ET
The project consists of reconstructing Johnson Avenue and associated utilities from Rome Street to Barnes Avenue and on Barnes Avenue from Johnson Avenue north approximately 250 feet. The project will include installation of new 18''-60'' storm sewer piping and drainage structures; new 8'' sanitary sewer main piping and manholes; new 8'' and 12'' water mains; reconnecting sanitary sewer and water services; relocation of existing utilities where necessary; saw-cutting and demolition of existing road and parking lots; milling and overlay portions of existing road; new full-depth pavement and curb and gutter for road and parking lots; new sidewalks; installation of a retaining wall; re-striping and re-signing roadway and parking lots; traffic control; erosion control (installation, maintenance, and removal); and permanent stabilization. The Contractor is expected to coordinate utility relocations with the City Engineer and Utility Owner(s). The City of Carrollton anticipates that the roads and adjacent parking lots will be partially and fully closed during certain phases of construction, but closure of the roads and parking lots will need to be kept to a minimum. The Contractor is expected to coordinate all lane/road/parking lot closures necessary throughout construction with the City Engineer. The Contractor will be required to maintain good communication and coordination with the Project Engineer and the City Engineer throughout construction of the project.
| Code | Description |
| 91345 | Construction, Sewer and Storm Drain |
Dalton Appleby
dappleby@carrollton-ga.gov
(770) 830-2000

With GovernmentContracts, you can:
...linear feet of 12? water main and 943 linear feet of 8? gravity ...
State Government of Georgia
Bid Due: 9/01/2026
..., but are not limited to: construction of gravity sanitary sewer and sanitary ...
State Government of Georgia
Bid Due: 9/17/2026
...measures, storm water detention facilities, storm sewer, sanitary sewer, water mains, curb and ...
City of Gainesville
Bid Due: 9/24/2026
...? HDPE pipe bursting of existing gravity sewer main, 8? cured in place ...
State Government of Georgia
Bid Due: 10/06/2026