| Location: | Georgia |
|---|---|
| Posted: | Jul 25, 2025 |
| Due: | Aug 28, 2025 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-75954-NONST-2026-000000008 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-75954-NONST-2026-000000008 | Wastewater Treatment Facility Improvements | Sylvester, City Of |
Jul 25, 2025 @ 05:36 PM
|
Aug 28, 2025 @ 11:00 AM
|
Start Date: Jul 25, 2025 @ 05:36 PM ET
End Date:
Aug 28, 2025 @ 11:00 AM ET
Bids for the construction of the Project will be received at the Sylvester City Hall located at 101 North Main Street, Sylvester, GA 31791, until Thursday, August 28, 2025 at 11:00 a.m. local time. At that time the Bids received will be publicly opened and read. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days except as specifically may be provided in the Instructions to Bidders and/or by State law. The work shall generally consist of furnishing all products and performing all labor necessary to construct the following: Pond rehabilitation, installation of new headworks screens, replacement of weir gates, aerator motor replacements, check valve replacement, electrical improvements, access drive improvements, fencing replacement, and all other appurtenances necessary to complete the project in accordance with the specifications and construction drawings. The work will be awarded in one (1) contract with a contract time of 240 days. Funding is to be provided by the Clean Water State Revolving Fund administered by the Georgia Environmental Finance Authority. This project will be subject to the Davis-Bacon Labor Standards, DBE Subcontract requirements, and the Build America Buy America Act.
This agreement is for services related to a project that is subject to the Build America, Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act (¿IIJA¿), Pub. L. 177-58. Absent an approved waiver, all iron, steel, manufactured products, and construction materials used in this project must be produced in the United States, as further outlined by the Office of Management and Budget¿s Memorandum M-22-11, Initial Implementation Guidance on Application of Buy America Preference in Federal Financial Assistance Programs for Infrastructure, April 18, 2022.
| Code | Description |
| 91391 | Maintenance and Repair, Wastewater Treatment Plant |
| 91359 | Construction and Upgrades, Wastewater Treatment Plant |
Jinny Boyd
jboyd@cityofsylvester.com
229-776-8513

With GovernmentContracts, you can:
...Steel: Angle, Ball, Check, Gate, Globe, etc. 67082 Valves, Steel: Angle, Check, Gate, ...
State Government of Georgia
Bid Due: 7/13/2026
...Valves, Steel: Angle, Check, Gate, Globe, etc. 67081 Valves, Stainless Steel: Angle, Ball, ...
State Government of Georgia
Bid Due: 6/09/2026
...67075 Valves, Iron Body: Angle, Check, Gate, Globe, etc. 67057 Plumbing Equipment, Accessories...
State Government of Georgia
Bid Due: 6/18/2026
...: replacement of gates and valves and their associated actuators; electrical, instrumentation, and ...
Cobb County
Bid Due: 6/11/2026