| Location: | Georgia |
|---|---|
| Posted: | Apr 1, 2026 |
| Due: | May 8, 2026 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-64452-NONST-2026-000000034 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-64452-NONST-2026-000000034 | Peachtree Creek Greenway Doraville Extension - Phase 2a Construction | Doraville, City Of |
Apr 01, 2026 @ 12:05 PM
|
May 08, 2026 @ 12:00 PM
|
Start Date: Apr 01, 2026 @ 12:05 PM ET
End Date:
May 08, 2026 @ 12:00 PM ET
The City of Doraville (hereafter, ¿City¿) has issued this Invitation to Bid (hereafter, ¿ITB¿) for the purpose of obtaining services to construct the Doraville Peachtree Creek Greenway Phase 2A.
The Doraville Peachtree Creek Greenway Phase 2A connects Aztec Road to Stewart Road along the north side of the tributary of Peachtree Creek. This is the model project segment outlined in the adopted 2022 Peachtree Creek Greenway Feasibility Study. This trail is being built within public right-of-way and on city easement within DeKalb County Board of Education (Sequoyah Middle School).
The project is approximately 2,551 linear feet (0.5 miles) and includes a 10¿ to 12¿ wide concrete trail. 630 linear feet of the project will include sidewalk improvements with new ADA accessible ramps along existing streets. The project scope also include one bridge crossing, retaining walls, landscape, and stormwater improvements. Additional work associated with the project includes minor demolition and clearing, erosion control, grading, trail amenities, and signage.
The new middle school is expected to open in Fall 2027, and the high school in Fall 2029. Contractors shall coordinate with the general contractor, site superintendent, and others as needed to ensure that construction activities shall not interfere with the school construction. Contact information will be provided by the City.
| Code | Description |
| 92544 | General Construction: Management, Scheduling, Cost Estimation Engineering |
| 91347 | Construction, Sidewalk and Driveway, Including Pedestrian and Handicap Ramps |
| 91226 | Construction, Hike and Bike Trail |
| 90638 | General Construction, Architectural Services |
Austin Shelton
austin.shelton@doravillega.us
7704518745

With GovernmentContracts, you can:
...: Construction / Public Works Government Type: K-12 Fiscal Year: 2027 Description We ...
State Government of Georgia
Bid Due: 7/02/2026
...Reimbursable 92537 Facilities Design Engineering 92544 General Construction: Management, Scheduling, Cost... Year: 2026 ...
State Government of Georgia
Bid Due: 6/10/2026
..., Construction, (Not Otherwise Classified) 92544 General Construction: Management, Scheduling, Cost... Category Type: ...
State Government of Georgia
Bid Due: 7/08/2026
...Type: Non-State Agency Event Status: Open Purchase Type: Non-State Agency Category Type: Construction... ...
State Government of Georgia
Bid Due: 6/02/2026