Looking for contract opportunity help?
General Information View Changes
-
Contract Opportunity Type: Solicitation (Updated)
-
Updated Published Date: Jul 29, 2025 04:05 pm EDT
-
Original Published Date: Jul 11, 2025 10:07 am EDT
-
Updated Date Offers Due: Aug 11, 2025 05:00 pm EDT
-
Original Date Offers Due: Aug 11, 2025 05:00 pm EDT
-
Inactive Policy: 15 days after date offers due
-
Updated Inactive Date: Aug 26, 2025
-
Original Inactive Date:
Aug 11, 2025
-
Initiative:
Classification
Description View Changes
BLM-CO SLVFO ZAPATA FALLS CAMPGROUND IMPROVEMENTS PHASE 1
This amendment it to remove Southway Pit maps (2), change project location to North and East of Alamosa, attaching updated SOW and Bid Schedule, and to extend the period of performance to 05/30/2026.
This is a solicitation announcement for a campground expansion project located within the Bureau of Land Management Zapata Falls Recreation Site, located in Alamosa County, Colorado. Zapata Falls Campground is approximately 29 miles North and East of Alamosa along CO-150 N.
Socio-economic Categories: While this procurement remains a competitive Total Small Business Set-Aside, the BLM highly encourages and welcomes quotes from all sub-categories of small business such as Small Disadvantaged, Woman Owned, Service Disabled Veteran, HUBZone, 8a, and Indian Small Business Economic Enterprises.
1.1 PROJECT DESCRIPTION
Furnishing labor, equipment, supplies, and materials, to convert existing Day Use Picnic Sites at Zapata Falls Campground into full campgrounds with mostly back in parking spaces. Work includes excavation and placement of earthen materials, placement of rock retention walls, demolition of existing day use areas, installation of tables and fire rings, installation of bear-proof trash cans, scarifying existing disturbed areas, and importing and placing aggregate surfacing material.
1.2 LOCATION
Work under this Contract is performed at Zapata Falls Recreation Site, located in Alamosa County, Colorado. The project location is at latitude: 37°37'17.85"N, longitude: 105°33'34.48"W and is approximately 29 miles North and East of Alamosa along CO-150 N. The work locations are shown on the drawings and attached maps.
1.3 WORK SCHEDULE
Work shall be completed by May 30, 2026. Work is not allowed on Federal holidays. Work shall occur Monday through Friday. Contract time will be paused, upon request, when snow or snowmelt prevents work at the project site.
Recreation site will still be open to visitors and must be roped off and signed for safety.
Period of Performance: September 1, 2025 - May 30, 2026
Rough Order of Magnitude - Between $100,000 and $250,000.
Basic Contracting Requirements:
1. Active Registration - www.sam.gov - check it now please. Updates and registrations have been taking longer than they used to due to the transition from the DUNS number to the UEI. If having issues, don't pay anyone. Free assistance is available at your local PTAC - https://www.aptac-us.org/
2. Invoicing and Payment - www.ipp.gov - 14 day prompt pay with progress payments
3. FAR Part 15 - Contracting by Negotiation
4. FAR Part 36 - Construction Provisions and Clauses
5. Davis Bacon Act Wages for Alamosa County, CO
6. Total Small Business Set-Aside for NAICS 237990 (Other Heavy and Civil Engineering Construction)- Size Std: $45M
7. Bid, Performance and Payment Bonding
8. Type of Contract - Firm Fixed Price
9. Basis of Award - Price and other Factors
Minimum Requirements for Responsive Quote:
1. Filled in, priced, dated and signed SF1442 with acknowledgement of all amendments.
2. Schedule B filled in with prices.
3. Bid Bond - 20% of Price
4. Technical Response per Section L and M.
5. Email items 1-4 above to the POC no later than the solicitation close date.
Primary POC: Contracting Officer Courtni Strickland c1strickland@blm.gov
Attachments/Links
Contact Information
Contracting Office Address
-
Denver Federal Center Building 40
-
Lakewood , CO 80225
-
USA
Secondary Point of Contact
History