| Location: | California |
|---|---|
| Posted: | Apr 29, 2026 |
| Due: | May 13, 2026 |
| Agency: | Ventura County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | CMA-241 |
| Publication URL: | To access bid details, please log in. |
Project Description: Runway 8-26 Rehabilitation – Camarillo Airport, Specification No. DOA 26-02, which consists of partial depth pavement removal of the runway asphalt surface by cold milling (3” approximate depth), asphalt crack repair, placement of an asphalt surface course (PG 70-10) (3” approximate thickness), tack coat, fog sealing with sand, installation of multiple colors of pavement markings, grooving of the runway pavement surface, removal of elevated runway edge light fixtures, removal of elevated runway threshold light fixtures, installation of elevated runway edge light fixtures on existing bases, installation of elevated runway threshold fixtures on existing bases, mobilization, airfield safety and traffic control, construction staking and survey layout, airport access road and haul route repair, and compliance with pollution, erosion, and siltation control.

With GovernmentContracts, you can:
...Project ID: 2024-RFP-0493 Title: Construction Manager at Risk (CMAR) with Guaranteed Maximum Price... ...
City of Pasadena
Bid Due: 6/08/2026
...the responsible charge of a Construction Manager with a minimum of 10 years ...
City of San Mateo
Bid Due: 6/18/2026
...charge of a Construction Manager with a minimum of 10 years of applicable ...
City of San Mateo
Bid Due: 6/18/2026
...for full details. Contact Betsy Jay Sr. Project Manager - Construction Division 415-473-4374 ...
Marin County
Bid Due: 6/11/2026