EDWARD M. BIRN
Director (Direktot)
RENA K. BORJA
Deputy Director (Sigundo Direktot)
GENERAL SERVICES AGENCY
(Ahension Setbision Hinirat)
Telephone (Telifon): (671) 475-1705/1706
LOURDES A. LEON GUERRERO
Governor (Maga’håga)
JOSHUA F. TENORIO
Lt. Governor (Sigundo Maga’låhi)
August 31, 2026
Invitation for Bid
GSA-041-26
AMENDMENT #2
Purchase and Install Standby Diesel Generator
1) Amend page 1 of 50.
From:
SUBMISSION DEADLINE: Tuesday, September 8, 2026, 2:00 PM ChST
BID OPENING DATE: Tuesday, September 8, 2026, 2:05 PM ChST
To now read:
SUBMISSION DEADLINE: Tuesday, September 15, 2026, 2:00 PM ChST
BID OPENING DATE: Tuesday, September 15, 2026, 2:05 PM ChST
2) Amend page 2 of 47.
From:
Deadline for Submission of Bid: Tuesday, September 8, 2026, 2:00 PM ChST
Bid Opening (Open to the Public): Tuesday, September 8, 2026, 2:05 PM ChST
To now read:
Deadline for Submission of Bid: Tuesday, September 15, 2026, 2:00 PM ChST
Bid Opening (Open to the Public): Tuesday, September 15, 2026, 2:05 PM ChST
3) Amend and replace pages 46 to 50 with the attached “Revised Pages 46 to 50” dated 8/31/2026.
All others remain unchanged.
Please Print
ACKNOWLEDGMENT COPY
Received By: _______________________
Date:
_______________________
Company/Name: _______________________
Email To: bids@gsadoa.guam.gov
Andriana Quitugua
Chief Procurement Officer
590 South Marine Corps Drive, ITC Building, Suite 230, Tamuning, Guam 96913 P. O. Box 7420, Tamuning, Guam 96913
Bid Form
Item Description
No.
QTY UOM Unit Price
1.1
Purchase and Install 55kW-75kVA
1
Lot
$
Standby Diesel Generator, with enclosure,
Automatic Transfer Switch and fuel tank;
Removal of existing generator and existing
fuel tank, as per the following specifications:
Total
$
GENERAL REQUIREMENTS:
The successful bidder shall provide all labor, materials, equipment, supervision, permits, testing, and incidental work
necessary to remove the existing generator and install a new generator, fuel tank, Automatic Transfer Switch (ATS),
and all associated electrical components at the Guam Police Department Tumon/Tamuning Precinct.
The work shall include the safe removal and disposal of existing equipment and the complete installation,
connection, testing, and commissioning of the new generator system, including all required fuel and electrical work.
Electrical work shall include the ATS, feeders, conduits, conductors, disconnects, grounding, bonding, controls, and
connections necessary for a complete and operational system.
The successful bidder shall verify existing electrical service, connected load, and site conditions prior to installation.
The ATS and associated electrical equipment shall be properly sized for the new generator, applicable codes, and
manufacturer requirements.
All work shall comply with applicable Guam laws, building and electrical codes, fire and life-safety requirements,
environmental requirements, manufacturer specifications, and requirements of all authorities having jurisdiction.
The successful bidder shall obtain all required permits and approvals and coordinate all necessary shutdowns with
the Guam Police Department. The completed system shall be fully operational, tested, code-compliant, and
approved prior to final acceptance.
The generator set (genset), ATS, aluminum weatherproof/sound-attenuating enclosure, and associated equipment
shall comply with all applicable Federal Buy American Act and domestic-content requirements incorporated into this
solicitation.
Code of Federal Regulations (CFR) Part 200 §200.322 Domestic Preferences for Procurements.
(a) The recipient or subrecipient should, to the greatest extent practicable and consistent with law, provide a
preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States
(including but not limited to iron, aluminum, steel, cement, and other manufactured products). The requirements of
this section must be included in all subawards, contracts, and purchase orders under Federal awards.
PROJECT DESCRIPTION AND LOCATIONS:
The scope of work for this project includes removing the existing generator and installing a new generator unit, fuel
tank, and automatic transfer switch at the Guam Police Department’s (GPD) Tumon/Tamuning Precinct in Tumon. The
removal and installation must comply with all approving agencies with jurisdiction and building code requirements.
“Revised” 8/31/2026
Amendment #2
Page 46 of 50
SPECIFICATIONS
BIDDING ON / REMARKS
Standby Generator:
Generator must be American-made and meet EPA requirements
55kW/75kVA
120/208 Volt three-phase 60Hz
Diesel Fuel Engine, EPA Certified, UL Certified
Full aluminum enclosure weather protection and sound dampening for low-
noise application, with muffler and/or exhaust
Engine Coolant Heater
Battery 600 CCA
Digital controller for unit
10A or greater battery charger
Automatic Voltage Regulator
Molded case circuit breakers, 120/208 VAC, 3-phase continuous current,
Aluminum Line Terminal Type, 35kA Interruption or breaking capacity (Icu/Ics)
Auto Start Control Module and Auto Mains (Utility)
Failure Control Module for monitoring engine parameters, annunciate
warnings, shutdown and engine information, Engine status information with
dedicated terminals
Vertical or Horizontal Air Cleaner evacuator valve, high-strength polymer with
compatibility and industry-standard elements
Minimum fuel tank of 150 gallons
Must include all electrical work for sufficient power supply to accommodate
unit with necessary amperage
Wires and cables shall meet applicable requirements of NEC (NFPA 70) and UL
for type of insulation, jacket, and conductor specified or indicated
Provide color coding for service, feeder, branch circuit, and control
conductors
Remove existing generator, enclosure, and fuel tank for new generator
enclosure and fuel tank
Provide complete grounding system, load bank test, start-up, and commission
test
Provide heavy equipment/crane lift and/or transport new and old generator
Automatic Transfer Switch (ATS):
Latest model ATS compatible with generator
Common failure relay
Test switch
Manual bypass of transfer to normal TD
Manual or automatic retransfer to normal with amber light to indicate manual
retransfer mode
ATS switch position indicating lights
Amber LED to indicate controller not in auto, either transfer inhibit or manual
mode
ATS position indicating contacts: (1) normal, (1) for emergency in-phase
monitor for load transfer
Load disconnect contacts with TD which operate before/after transfer
Fully programmable engine exerciser with seven independent routines to
exercise the generator with or without load on a daily, weekly, bi-weekly, or
monthly basis. Settings can be displayed and changed from the user interface
keypad
“Revised” 8/31/2026
Amendment #2
Page 47 of 50
Event log display shows the event number, time and date of event, event type,
and event reason
Communication port enabled and common alarm output contact
Warranty: Minimum warranty of two (2) years for parts, labor, and
workmanship
Scope of Work:
The bidder must be responsible for the complete removal and installation of
a new standby generator unit, automatic transfer switch, and tank. The bidder
must be responsible for ascertaining pertinent conditions, such as the
location, accessibility, general character of the site, and the extent of existing
conditions within or adjacent to the site. No additional compensation will be
made by reason of any misunderstanding or error regarding the site, its
condition, accessibility, or the amount or kind of work to be performed.
The bidder shall be responsible for the removal of the existing generator unit,
enclosure, fuel tank, automatic transfer switch, conduits, wiring, feeders, and
other instrumentation deemed unnecessary for the new system.
Provide and install a new generator unit, enclosure, fuel tank, and automatic
transfer switch, along with conduits, wiring, feeders, and other
instrumentation deemed necessary for the new system, complete and ready
to use.
Bidder shall replace the existing chain-link door of the enclosure with a new
aluminum louvered door with locks. The Bidder is responsible for providing
and installing the new generator, enclosure, fuel tank, and ATS, based on the
given existing conditions and requirements. The new generator unit shall be
EPA engine-compliant and have a full fuel tank.
The bidder is responsible for installing new generator isolation or vibration
pads, as needed, to accommodate the new generator unit.
Perform automatic start-up by means of a simulated power outage to test
remote automatic start-up, load transfer, and automatic shutdown. Engine
coolant temperature, oil pressure, and battery charge level, along with
generator voltage, amperage, and frequency, shall be monitored throughout
the test.
Provide electrical works for sufficient power supply to existing power source.
The removal of the existing 55 kW generator and all associated debris;
Disposal/removal/recovery of existing fuel and fluids as per EPA Regulations
on Hazardous Materials & Debris Fuel Recovery, Hauling & Disposal; Hauling
& Disposal of Debris as per Guam EPA Regulations on Hazardous Materials.
Bidder shall transport old equipment only to locations approved by EPA,
including recycling facilities, landfills, hardfills, or other lawful disposal
locations, as applicable.
The bidder shall provide all management, supervision, engineering, quality
control, labor, equipment, materials, and supplies necessary to furnish and
install the standby generator unit and transfer switch, including services
incidental to the removal and installation to make the system work.
“Revised” 8/31/2026
Amendment #2
Page 48 of 50
The bidder shall be professionally responsible for the services performed
under this contract. They should be responsive to all government criteria,
information, guidance, and review comments. All services shall be in full
compliance with the Federal and Local requirements, design codes and/or
guides.
The successful bidder shall provide an online diagram/shop drawing detailing
the installation of the new generator unit and automatic transfer switch
prepared/approved by a Master Electrician or Professional Engineer.
The successful bidder shall coordinate with the GPD coordinator on all
additional electrical requirements, as necessary.
The successful bidder shall coordinate their work with the agencies, local or
federal, with jurisdiction over permit review and approval, as needed.
All work areas shall be kept clean. Those areas used by the bidder’s employees
shall be kept as clean as possible at all times. No accumulation of debris will
be allowed. Debris shall be disposed of off-site daily, and job-site materials
must be confined to an area designated by the GPD coordinator.
Under any circumstances, the bidder shall secure the job site area thoroughly
protected and safe at the end of each working day.
The successful bidder shall submit a work schedule prior to commencing any
activity. Provide a schedule highlighting the major project milestones and the
specific completion dates for each activity.
The successful bidder shall be responsible for providing training for all
Government of Guam personnel involved in the maintenance and operation
of the new generator unit. Up to three (3) hard or soft copies of the
repair/service manuals shall be submitted to the GPD coordinator.
The bidder shall comply with all government agencies for reviewing and
approving the work, as needed:
1. Building Law, Government Coe of Guam (Latest Edition)
2. International Building Code (Latest Edition)
3. International Mechanical Code (Latest Edition)
4. International Plumbing Code (Latest Edition)
5. National Electrical Code (NEC-Latest Edition)
6. National Electric Safety Code (NESC-Latest Edition)
7. Life Safety Code (Latest Edition)
8. International Fire Code (IFC-Latest Edition)
9. National Fire Protection Association Handbook (NFPA70)
10. Illuminating Engineering Society (IES)
11. American Disability Act (ADA)
12. GEPA, USEPA, CFR29
13. Guam Energy Code
14. All other codes, regulations, technical publications, and design