| Location: | Arizona |
|---|---|
| Posted: | Oct 21, 2026 |
| Due: | Nov 9, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | F3YCFA6173AC01 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The Government intends to hold a site visit for subject requirement on 4 November 2026 at 0900 AM. Below you will find the instructions and required documents to attend.
Only SBA Certified Women Owned Small-Businesses are eligible for this requirement.
**THIS IS THE ONLY DATE AND TIME FOR THE SITE VISIT, REQUESTS TO MAKE ANY CHANGES WILL BE DENIED**
Attendance will be limited to 2 representatives for each contractor.
To attend please provide the attached template (Site Visit Base Access_Template) completed with the below information, to rachel.tilley.1@us.af.mil, no later than 26 October 2026 at 1500 Arizona Time.
Required Info: Last Name, First Name, DOB, US Citizen, License or ID#, State of Issue, Last 4 SSN
To access the installation, the attendee will be required to have a REAL ID or Government Issued Passport.
When submitting the above information, please include a copy of the form of ID to allow for Security Forces to verify if it meets the requirements.
**QUESTIONS ARE DUE NO LATER THAN COB 22 OCTOBER 2026 at 1500 AZ time**
***FINALIZED Q&A Document will be posted with answers no later than 26 October 2026***
This SOW defines the requirement for the Contractor to Engineer, Furnish, Install and Test (EFI&T) new 12-Strand (St), Single Mode (SM) Fiber Optic Cable (FOC) from Radar Approach Control (RAPCON, B979) to Air Traffic Control Tower (ATCT, B998), Base Operation (Ops)B453), Command Post (CP, B11), Localizer (B1375), Glide Slope (GS, B1056), Tactical Air Navigation (TACAN, B1049), Ground Antenna Transmit and Receive (GATR, B1040), Glide Slope (B1081 and Localizer (B1059). Also, 12-St SM FOC from Base Ops (B453) to Primary and Secondary Automatic Meteorological Station (FMQ-19s). The work will be performed at Luke AFB AZ by using new and existing Manhole/Handhole Duct System. Some portion of the cable route/path will be Direct Buried. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in this SOW. All equipment, supplies, or materials provided shall be new and not refurbished. No equipment, supplies, or material will be provided by the government. All materials used in this SOW must be rust-proof and corrosion-resistant, due to the nature of the environment.
See attached Solicitation and supporting documents for additional information.
| Oct 7, 2026 | [Combined Synopsis/Solicitation (Original)] 56 CS FOC to Flightline and Wx Equipment, Luke AFB |
| Oct 8, 2026 | [Combined Synopsis/Solicitation (Updated)] 56 CS FOC to Flightline and Wx Equipment, Luke AFB |
| Oct 13, 2026 | [Combined Synopsis/Solicitation (Updated)] 56 CS FOC to Flightline and Wx Equipment, Luke AFB |
| Oct 15, 2026 | [Combined Synopsis/Solicitation (Updated)] 56 CS FOC to Flightline and Wx Equipment, Luke AFB |
| Oct 19, 2026 | [Combined Synopsis/Solicitation (Updated)] 56 CS FOC to Flightline and Wx Equipment, Luke AFB |
| Oct 28, 2026 | [Combined Synopsis/Solicitation (Updated)] 56 CS FOC to Flightline and Wx Equipment, Luke AFB |
| Nov 4, 2026 | [Combined Synopsis/Solicitation (Updated)] 56 CS FOC to Flightline and Wx Equipment, Luke AFB |
| Nov 9, 2026 | [Combined Synopsis/Solicitation (Updated)] 56 CS FOC to Flightline and Wx Equipment, Luke AFB |

With GovernmentContracts, you can:
Project: HOME- Roof, Electric, Bathroom, Kitchen- McNeal Ref. #: 27-03-DEV-01 Type: ITB Status:
Cochise County
Bid Due: 12/10/2026
DOWNLOAD TUBA CITY WASTEWATER TREATMENT PLANT IMPROVEMENTS PROJECT Date: November 24, 2026, at
Navajo Tribal Utility Authority
Bid Due: 11/24/2026
Project ID: Title: Employee Benefits- Life/STD/FSA/HSA/COBRA Addenda: 0 Release Date: 10/20/2026 Due Date:
Tempe Union High School District
Bid Due: 11/19/2026
Pavement Marking (2027-2028) Department: Public Works Category: Yuma County RFP's RFP Number: 2027-2028CY.05
Yuma County
Bid Due: 11/24/2026