| Location: | Connecticut |
|---|---|
| Posted: | Aug 20, 2025 |
| Due: | Oct 2, 2025 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PWC 26-10 |
| Publication URL: | To access bid details, please log in. |
The project includes replacing Primary Clarifier No. 2’s mechanism and associated equipment at the Water Pollution Control Facility due to a major mechanism failure. Work includes replacing the main clarifier mechanism including the bridge, center column, scum trough and beach, sludge collector mechanism, connections to existing piping and existing pumps for sludge handling, removal, and replacement of the grout layer on the Clarifier floor, and the replacement of electrical conduit and wiring associated with the electrical equipment for the mechanism. Additionally, as an alternate the project includes installing a jockey pump in the effluent pump station, fittings and restraints, structurally modifying the pump/pipe gallery, providing variable frequency drive (VFD) for the new pump, connecting to the SCADA panel and PLC, associated electrical and controls equipment/wiring.
Karl Klein 45 Fort Hill Rd. Groton CT, 06340 United States Tel: 860-441-6681 Fax: kklein@groton-ct.gov

With GovernmentContracts, you can:
...IPSWICH WATER TREATMENT PLANT, DWSRF 19229 Location: 274 High St. - Ipswich, Massachusetts ...
O'Connell Companies
Bid Due: 10/14/2026
...: 10/7/2026 Follow B027-11 Merimere Liner Replacement Invitation To Bid Water 05586 , ...
City of Meriden
Bid Due: 10/07/2026
...a Public Utility Dept. that is comprised of a Water Division with three ...
City of Meriden
Bid Due: 10/01/2026
...-013 FILTER MEDIA REPLACEMENT CHARLES B. BACON WATER TREATMENT PLANT Water and Sewer ...
City of Middletown
Bid Due: 9/30/2026