| Location: | Connecticut |
|---|---|
| Posted: | Aug 20, 2025 |
| Due: | Oct 2, 2025 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PWC 26-10 |
| Publication URL: | To access bid details, please log in. |
The project includes replacing Primary Clarifier No. 2’s mechanism and associated equipment at the Water Pollution Control Facility due to a major mechanism failure. Work includes replacing the main clarifier mechanism including the bridge, center column, scum trough and beach, sludge collector mechanism, connections to existing piping and existing pumps for sludge handling, removal, and replacement of the grout layer on the Clarifier floor, and the replacement of electrical conduit and wiring associated with the electrical equipment for the mechanism. Additionally, as an alternate the project includes installing a jockey pump in the effluent pump station, fittings and restraints, structurally modifying the pump/pipe gallery, providing variable frequency drive (VFD) for the new pump, connecting to the SCADA panel and PLC, associated electrical and controls equipment/wiring.
Karl Klein 45 Fort Hill Rd. Groton CT, 06340 United States Tel: 860-441-6681 Fax: kklein@groton-ct.gov

With GovernmentContracts, you can:
...Invitation to Bid for Construction Services Rowland Government Center - Energy Audit... Vendors ...
State Government of Connecticut
Bid Due: 12/15/2026
...Bid Number: 2026-017 Bid Title: Construction of New 911 Building Category: Construction Projects..., ...
City of Middletown
Bid Due: 11/18/2026
...Bid Number: 2026-017 Bid Title: Construction of New 911 Building Category: Construction Projects... ...
City of Middletown
Bid Due: 11/04/2026
...Invitation to Bid for Construction Services CVH - Old Power Plant Renovations Holmes ...
State Government of Connecticut
Bid Due: 12/16/2026