DC00498_W-5703C US 421 @ WILLOUGHBY PARK

Location: North Carolina
Posted: Feb 12, 2026
Due: Feb 19, 2026
Agency: Division of Highways
Type of Government: State & Local
Category:
  • 59 - Electrical and Electronic Equipment Components
Publication URL: To access bid details, please log in.
  • DC00498_W-5703C US 421 @ WILLOUGHBY PARK
    POC
    DC00498_W-5703C US 421 @ WILLOUGHBY PARK
  • Attachment Preview

    JOSH STEIN
    GOVERNOR
    STATE OF NORTH CAROLINA
    DEPARTMENT OF TRANSPORTATION
    DANIEL H. JOHNSON
    SECRETARY
    February 12, 2026
    To: Prospective Bidders
    From: Jonathan W. Mitchell
    Division Contract Engineer
    Contract ID#:
    TIP#:
    WBS Element:
    F.A.#:
    DC00498
    W-5703C
    44849.3.3
    HSIP-0421(091)
    Subject: Addendum #1: US 421 (Carolina Beach Road) From NC132 (S. College Rd)
    to Approximately 200' North of Willoughby Park Road.
    The Subject contract proposal contains the following addendum:
    1- The completion date on page G-2 has changed. Replace page G-2 in the
    proposal with the attached.
    2- Add the attached Impact Attenuator Units, Type TL-3 Special Provision.
    3- The bid form has been edited. Replace with the attached revised bid form.
    4- The plan set has been edited. The old plan set on the NCDOT letting site has
    been replaced with a revised plan set.
    ***An Addendum has been added to Bid Express & the NCDOT Letting Site.
    Mailing Address:
    NC DEPARTMENT OF TRANSPORTATION
    DIVISION OF HIGHWAYS
    5501 BARBADOS BOULEVARD
    CASTLE HAYNE, NC 28429-5647
    Telephone: (910) 341-2000
    Fax: (910) 675-0143
    Customer Service: 1-877-368-4968
    Website: www.ncdot.gov
    Location:
    5501 BARBADOS BOULEVARD
    CASTLE HAYNE, NC 28429-5647
    ADDENDUM #1 ISSUED: 02/12/2026
    DC00498 W-5703C
    G-2
    New Hanover County
    Before any construction material or manufactured product is eligible for payment, the Contractor
    shall submit a certification from the manufacturer or supplier confirming compliance with the
    BABA Act and applicable regulations. A separate certification is required for each shipment or
    delivery and must clearly identify the items covered, linked to the associated bill of lading, invoice,
    or packing list.
    The Contractor shall ensure that certifications from the manufacturer or supplier are obtained and
    submitted to the Engineer for all construction materials and manufactured products permanently
    incorporated into the work. Compliance with BABA requirements is the responsibility of the
    manufacturer or supplier. The Engineer will retain documentation for audit or inspection purposes.
    CONTRACT TIME AND LIQUIDATED DAMAGES:
    (8-15-00) (Rev. 5-16-23)
    108
    SP1 G08 A
    The date of availability for this contract is April 6, 2026, except that work in jurisdictional waters
    and wetlands shall not begin until a meeting between the DOT, Regulatory Agencies, and the
    Contractor is held as stipulated in the permits contained elsewhere in this proposal. This delay in
    availability has been considered in determining the contract time for this project.
    The completion date for this contract is December 24, 2027.
    Except where otherwise provided by the contract, observation periods required by the contract will
    not be a part of the work to be completed by the completion date and/or intermediate contract times
    stated in the contract. The acceptable completion of the observation periods that extend beyond
    the final completion date shall be a part of the work covered by the performance and payment
    bonds.
    The liquidated damages for this contract are Two Hundred Dollars ($ 200.00) per calendar day.
    These liquidated damages will not be cumulative with any liquidated damages which may become
    chargeable under Intermediate Contract Time Number 1.
    INTERMEDIATE CONTRACT TIME NUMBER 1 AND LIQUIDATED DAMAGES:
    (7-1-95) (Rev. 2-21-12)
    108
    SP1 G13 A
    Except for that work required under the Project Special Provisions entitled Planting, Reforestation
    and/or Permanent Vegetation Establishment, included elsewhere in this proposal, the Contractor
    will be required to complete all work included in this contract and shall place and maintain traffic
    on same.
    The date of availability for this intermediate contract time is April 6, 2026.
    The completion date for this intermediate contract time is June 25, 2027.
    The liquidated damages for this intermediate contract time are One Thousand Six Hundred
    Dollars ($ 1,600.00) per calendar day.
    Upon apparent completion of all the work required to be completed by this intermediate date, a
    final inspection will be held in accordance with Article 105-17 and upon acceptance, the
    ADDENDUM #1 ISSUED: 02/12/2026
    IMPACT ATTENUATOR UNITS, TYPE TL-3___:
    (4-20-04)(Rev. 8-20-24)
    Description
    SP8 R75
    Furnish and install impact attenuator units and any components necessary to connect the impact
    attenuator units in accordance with the manufacturer’s requirement, the details in the plans and at
    locations shown in the plans.
    Materials
    Furnish attenuator units listed on the NCDOT APL. Units shall not be modified by the
    manufacturer and installer once approved and on the NCDOT APL.
    Prior to installation the Contractor shall submit to the Engineer certified working drawings and
    assembling instructions from the manufacturer for each impact attenuator unit in accordance with
    Article 105-2 of the Standard Specifications.
    Construction Methods
    Perform installation in accordance with the plans and details and assembling instructions furnished
    by the manufacturer.
    Measurement and Payment
    Impact Attenuator Unit, Type TL-3 will be measured and paid at the contract unit price per each.
    Such prices and payment will be full compensation for all work covered by this provision
    including, but not limited to, furnishing, installing and all incidentals necessary to complete the
    work.
    Payment will be made under:
    Pay Item
    Impact Attenuator Units, Type TL-3
    Pay Unit
    Each
    Feb 12, 2026 9:54 AM
    County: NEW HANOVER
    Line
    #
    Item Number
    0001 0000100000-N
    0002 0000400000-N
    0003 0008000000-E
    0004 0022000000-E
    0005 0106000000-E
    0006 0163000000-E
    0007 0223000000-E
    0008 0318000000-E
    0009 0321000000-E
    0010 0448200000-E
    0011 0448300000-E
    0012 0448400000-E
    0013 0594000000-E
    0014 0636000000-E
    0015 0995000000-E
    0016 1011000000-N
    0017 1099500000-E
    ITEMIZED PROPOSAL FOR CONTRACT NO. DC00498
    Sec Description
    #
    ROADWAY ITEMS
    800 MOBILIZATION
    801 CONSTRUCTION SURVEYING
    200 SUPPLEMENTARY CLEARING &
    GRUBBING
    225 UNCLASSIFIED EXCAVATION
    230 BORROW EXCAVATION
    250 REMOVAL OF EXISTING CONCRETE
    PAVEMENT
    275 ROCK PLATING
    300 FOUNDATION CONDITIONING
    MATERIAL, MINOR STRUCTURES
    300 FOUNDATION CONDITIONING
    GEOTEXTILE
    310 15" RC PIPE CULVERTS, CLASS IV
    310 18" RC PIPE CULVERTS, CLASS IV
    310 24" RC PIPE CULVERTS, CLASS IV
    310 24" CS PIPE CULVERTS, 0.064" THICK
    310 **" CS PIPE ELBOWS, *****" THICK
    24", 0.064"
    340 PIPE REMOVAL
    500 FINE GRADING
    505 SHALLOW UNDERCUT
    Quantity Unit Cost
    Lump Sum
    L.S.
    Lump Sum
    L.S.
    1
    ACR
    500
    CY
    1,500
    CY
    50
    SY
    25
    SY
    240
    TON
    750
    SY
    552
    LF
    1,300
    LF
    360
    LF
    16
    LF
    2
    EA
    535
    LF
    Lump Sum
    L.S.
    100
    CY
    Page 1 of 9
    Amount
    Feb 12, 2026 9:54 AM
    County: NEW HANOVER
    Line
    #
    0018
    Item Number
    1099700000-E
    0019 1111000000-E
    0020 1112000000-E
    0021 1121000000-E
    0022 1330000000-E
    0023 1491000000-E
    0024 1503000000-E
    0025 1523000000-E
    0026 1575000000-E
    0027 1693000000-E
    0028 2253000000-E
    0029 2275000000-E
    0030 2286000000-N
    0031 2308000000-E
    0032 2354200000-N
    0033 2374000000-N
    0034 2374000000-N
    ITEMIZED PROPOSAL FOR CONTRACT NO. DC00498
    Sec Description
    #
    505 CLASS IV SUBGRADE STABILIZATION
    SP CLASS IV AGGREGATE
    STABILIZATION
    505 GEOTEXTILE FOR SUBGRADE
    STABILIZATION
    520 AGGREGATE BASE COURSE
    607 INCIDENTAL MILLING
    610 ASPHALT CONC BASE COURSE, TYPE
    B25.0C
    610 ASPHALT CONC INTERMEDIATE
    COURSE, TYPE I19.0C
    610 ASPHALT CONC SURFACE COURSE,
    TYPE S9.5C
    620 ASPHALT BINDER FOR PLANT MIX
    654 ASPHALT PLANT MIX, PAVEMENT
    REPAIR
    840 PIPE COLLARS
    SP FLOWABLE FILL
    840 MASONRY DRAINAGE STRUCTURES
    840 MASONRY DRAINAGE STRUCTURES
    840 FRAME WITH GRATE, STD 840.24
    840 FRAME WITH GRATE & HOOD, STD
    840.03, TYPE **
    E
    840 FRAME WITH GRATE & HOOD, STD
    840.03, TYPE **
    F
    Quantity Unit Cost
    200
    TON
    50
    TON
    300
    SY
    39
    TON
    400
    SY
    290
    TON
    110
    TON
    110
    TON
    30
    TON
    15
    TON
    0.447
    CY
    3
    CY
    37
    EA
    31.5
    LF
    12
    EA
    3
    EA
    10
    EA
    Page 2 of 9
    Amount
    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    Follow Repair BEQ FC555 Active Contract Opportunity Notice ID N4008526R9043 Related Notice Department/Ind.

    DEPT OF DEFENSE

    Bid Due: 7/13/2026

    Follow Class 5 Information Processing System (IPS) Security Container Active Contract Opportunity Notice

    DEPT OF DEFENSE

    Bid Due: 6/22/2026

    Follow SAAF and MAAF Airfield Lighting System Maintenance and Repair Active Contract Opportunity

    DEPT OF DEFENSE

    Bid Due: 6/22/2026

    Solicitation Number: 281-FB26257 Project Title: 3820 N. Liberty Street Restroom Renovations Description: This

    State Government of North Carolina

    Bid Due: 7/15/2026

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.