JOSH STEIN
GOVERNOR
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
DANIEL H. JOHNSON
SECRETARY
February 12, 2026
To: Prospective Bidders
From: Jonathan W. Mitchell
Division Contract Engineer
Contract ID#:
TIP#:
WBS Element:
F.A.#:
DC00498
W-5703C
44849.3.3
HSIP-0421(091)
Subject: Addendum #1: US 421 (Carolina Beach Road) From NC132 (S. College Rd)
to Approximately 200' North of Willoughby Park Road.
The Subject contract proposal contains the following addendum:
1- The completion date on page G-2 has changed. Replace page G-2 in the
proposal with the attached.
2- Add the attached Impact Attenuator Units, Type TL-3 Special Provision.
3- The bid form has been edited. Replace with the attached revised bid form.
4- The plan set has been edited. The old plan set on the NCDOT letting site has
been replaced with a revised plan set.
***An Addendum has been added to Bid Express & the NCDOT Letting Site.
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
5501 BARBADOS BOULEVARD
CASTLE HAYNE, NC 28429-5647
Telephone: (910) 341-2000
Fax: (910) 675-0143
Customer Service: 1-877-368-4968
Website: www.ncdot.gov
Location:
5501 BARBADOS BOULEVARD
CASTLE HAYNE, NC 28429-5647
ADDENDUM #1 ISSUED: 02/12/2026
DC00498 W-5703C
G-2
New Hanover County
Before any construction material or manufactured product is eligible for payment, the Contractor
shall submit a certification from the manufacturer or supplier confirming compliance with the
BABA Act and applicable regulations. A separate certification is required for each shipment or
delivery and must clearly identify the items covered, linked to the associated bill of lading, invoice,
or packing list.
The Contractor shall ensure that certifications from the manufacturer or supplier are obtained and
submitted to the Engineer for all construction materials and manufactured products permanently
incorporated into the work. Compliance with BABA requirements is the responsibility of the
manufacturer or supplier. The Engineer will retain documentation for audit or inspection purposes.
CONTRACT TIME AND LIQUIDATED DAMAGES:
(8-15-00) (Rev. 5-16-23)
108
SP1 G08 A
The date of availability for this contract is April 6, 2026, except that work in jurisdictional waters
and wetlands shall not begin until a meeting between the DOT, Regulatory Agencies, and the
Contractor is held as stipulated in the permits contained elsewhere in this proposal. This delay in
availability has been considered in determining the contract time for this project.
The completion date for this contract is December 24, 2027.
Except where otherwise provided by the contract, observation periods required by the contract will
not be a part of the work to be completed by the completion date and/or intermediate contract times
stated in the contract. The acceptable completion of the observation periods that extend beyond
the final completion date shall be a part of the work covered by the performance and payment
bonds.
The liquidated damages for this contract are Two Hundred Dollars ($ 200.00) per calendar day.
These liquidated damages will not be cumulative with any liquidated damages which may become
chargeable under Intermediate Contract Time Number 1.
INTERMEDIATE CONTRACT TIME NUMBER 1 AND LIQUIDATED DAMAGES:
(7-1-95) (Rev. 2-21-12)
108
SP1 G13 A
Except for that work required under the Project Special Provisions entitled Planting, Reforestation
and/or Permanent Vegetation Establishment, included elsewhere in this proposal, the Contractor
will be required to complete all work included in this contract and shall place and maintain traffic
on same.
The date of availability for this intermediate contract time is April 6, 2026.
The completion date for this intermediate contract time is June 25, 2027.
The liquidated damages for this intermediate contract time are One Thousand Six Hundred
Dollars ($ 1,600.00) per calendar day.
Upon apparent completion of all the work required to be completed by this intermediate date, a
final inspection will be held in accordance with Article 105-17 and upon acceptance, the
ADDENDUM #1 ISSUED: 02/12/2026
IMPACT ATTENUATOR UNITS, TYPE TL-3___:
(4-20-04)(Rev. 8-20-24)
Description
SP8 R75
Furnish and install impact attenuator units and any components necessary to connect the impact
attenuator units in accordance with the manufacturer’s requirement, the details in the plans and at
locations shown in the plans.
Materials
Furnish attenuator units listed on the NCDOT APL. Units shall not be modified by the
manufacturer and installer once approved and on the NCDOT APL.
Prior to installation the Contractor shall submit to the Engineer certified working drawings and
assembling instructions from the manufacturer for each impact attenuator unit in accordance with
Article 105-2 of the Standard Specifications.
Construction Methods
Perform installation in accordance with the plans and details and assembling instructions furnished
by the manufacturer.
Measurement and Payment
Impact Attenuator Unit, Type TL-3 will be measured and paid at the contract unit price per each.
Such prices and payment will be full compensation for all work covered by this provision
including, but not limited to, furnishing, installing and all incidentals necessary to complete the
work.
Payment will be made under:
Pay Item
Impact Attenuator Units, Type TL-3
Pay Unit
Each
Feb 12, 2026 9:54 AM
County: NEW HANOVER
Line
#
Item Number
0001 0000100000-N
0002 0000400000-N
0003 0008000000-E
0004 0022000000-E
0005 0106000000-E
0006 0163000000-E
0007 0223000000-E
0008 0318000000-E
0009 0321000000-E
0010 0448200000-E
0011 0448300000-E
0012 0448400000-E
0013 0594000000-E
0014 0636000000-E
0015 0995000000-E
0016 1011000000-N
0017 1099500000-E
ITEMIZED PROPOSAL FOR CONTRACT NO. DC00498
Sec Description
#
ROADWAY ITEMS
800 MOBILIZATION
801 CONSTRUCTION SURVEYING
200 SUPPLEMENTARY CLEARING &
GRUBBING
225 UNCLASSIFIED EXCAVATION
230 BORROW EXCAVATION
250 REMOVAL OF EXISTING CONCRETE
PAVEMENT
275 ROCK PLATING
300 FOUNDATION CONDITIONING
MATERIAL, MINOR STRUCTURES
300 FOUNDATION CONDITIONING
GEOTEXTILE
310 15" RC PIPE CULVERTS, CLASS IV
310 18" RC PIPE CULVERTS, CLASS IV
310 24" RC PIPE CULVERTS, CLASS IV
310 24" CS PIPE CULVERTS, 0.064" THICK
310 **" CS PIPE ELBOWS, *****" THICK
24", 0.064"
340 PIPE REMOVAL
500 FINE GRADING
505 SHALLOW UNDERCUT
Quantity Unit Cost
Lump Sum
L.S.
Lump Sum
L.S.
1
ACR
500
CY
1,500
CY
50
SY
25
SY
240
TON
750
SY
552
LF
1,300
LF
360
LF
16
LF
2
EA
535
LF
Lump Sum
L.S.
100
CY
Page 1 of 9
Amount
Feb 12, 2026 9:54 AM
County: NEW HANOVER
Line
#
0018
Item Number
1099700000-E
0019 1111000000-E
0020 1112000000-E
0021 1121000000-E
0022 1330000000-E
0023 1491000000-E
0024 1503000000-E
0025 1523000000-E
0026 1575000000-E
0027 1693000000-E
0028 2253000000-E
0029 2275000000-E
0030 2286000000-N
0031 2308000000-E
0032 2354200000-N
0033 2374000000-N
0034 2374000000-N
ITEMIZED PROPOSAL FOR CONTRACT NO. DC00498
Sec Description
#
505 CLASS IV SUBGRADE STABILIZATION
SP CLASS IV AGGREGATE
STABILIZATION
505 GEOTEXTILE FOR SUBGRADE
STABILIZATION
520 AGGREGATE BASE COURSE
607 INCIDENTAL MILLING
610 ASPHALT CONC BASE COURSE, TYPE
B25.0C
610 ASPHALT CONC INTERMEDIATE
COURSE, TYPE I19.0C
610 ASPHALT CONC SURFACE COURSE,
TYPE S9.5C
620 ASPHALT BINDER FOR PLANT MIX
654 ASPHALT PLANT MIX, PAVEMENT
REPAIR
840 PIPE COLLARS
SP FLOWABLE FILL
840 MASONRY DRAINAGE STRUCTURES
840 MASONRY DRAINAGE STRUCTURES
840 FRAME WITH GRATE, STD 840.24
840 FRAME WITH GRATE & HOOD, STD
840.03, TYPE **
E
840 FRAME WITH GRATE & HOOD, STD
840.03, TYPE **
F
Quantity Unit Cost
200
TON
50
TON
300
SY
39
TON
400
SY
290
TON
110
TON
110
TON
30
TON
15
TON
0.447
CY
3
CY
37
EA
31.5
LF
12
EA
3
EA
10
EA
Page 2 of 9