ADMINISTRATIVE FACILITIES PLANNING, SPACE PROGRAMMING, AND POTENTIAL CONSOLIDATION STUDY

Location: Maryland
Posted: Oct 20, 2026
Due: Nov 12, 2026
Agency: Montgomery County Public Schools
Type of Government: State & Local
Category:
  • X - Lease or Rental of Facilities
Solicitation No: 9923.1
Publication URL: To access bid details, please log in.
Open Solicitation
Bid/RFP Number: 9923.1
Solicitation Title

ADMINISTRATIVE FACILITIES PLANNING, SPACE PROGRAMMING, AND POTENTIAL CONSOLIDATION STUDY

Due Date & Time

11/12/2026 02:00 PM

Contract Type

RFP

Buyer E-mail

Comfort_O_Baiyeshea@mcpsmd.org

Description

The intended outcome of this study is to provide MCPS with clearly documented understanding of: 1.How MCPS administrative facilities are currently being utilized 2.How administrative employees currently work and how they anticipate working in the future 3.The space needs of MCPS administrative divisions and departments 4.Appropriate planning assumptions for personal workspace, collaboration, support, and shared administrative functions 5.Division and Departmental adjacency and operational requirements 6.The overall space requirements for MCPS administrative functions 7.Potential opportunities and implications associated with administrative facility consolidation 8.The operational and planning-level cost implications of alternative approaches 9.Recommendations and decision points that can be used by MCPS to determine whether and how to proceed with future planning phases.

eMaryland Marketplace link BPM059414

Attachment Preview

FACILITY CONDITION ASSESSMENT
prepared for
Montgomery County Public Schools
45 West Gude Drive, Suite 4000
Rockville, MD 20850
Carver Educational Services Center
850 Hungerford Drive
Rockville, MD 20850
PREPARED BY:
Bureau Veritas
6021 University Boulevard, Suite 200
Ellicott City, MD 21043
800.733.0660
www.bvna.com
BV CONTACT:
Bill Champion
Senior Program Manager
443.622.5067
Bill.Champion@bureauveritas.com
BV PROJECT #:
172559.25R000-216.354
DATE OF REPORT:
August 11, 2025
ON SITE DATE:
July 24, 2025
Bureau Veritas
6021 University Boulevard, Suite 200 | Ellicott City, MD 21043 | www.bvna.com | p 800.733.0660
CARVER EDUCATIONAL SERVICES CENTER
BUREAU VERITAS PROJECT: 172559.25R000-216.354
TABLE OF CONTENTS
1. Executive Summary ............................................................................................................................. 1
Property Overview and Assessment Details .......................................................................................... 1
Campus Findings and Deficiencies ........................................................................................................ 2
Facility Characteristic Survey ................................................................................................................. 3
Facility Condition Index (FCI) Depleted Value ....................................................................................... 4
Immediate Needs.................................................................................................................................... 5
Key Findings ........................................................................................................................................... 6
Plan Types.............................................................................................................................................. 9
2. Elementary School Building.............................................................................................................. 10
3. Site Summary...................................................................................................................................... 13
4. ADA Accessibility ............................................................................................................................... 15
5. Purpose and Scope ............................................................................................................................ 17
6. Opinions of Probable Costs .............................................................................................................. 19
Methodology ......................................................................................................................................... 19
Definitions ............................................................................................................................................. 20
7. Certification......................................................................................................................................... 21
8. Appendices ......................................................................................................................................... 22
www.bvna.com | p 800.733.0660
CARVER EDUCATIONAL SERVICES CENTER
BUREAU VERITAS PROJECT: 172559.25R000-216.354
1. Executive Summary
Property Overview and Assessment Details
General Information
Property Type
Educational Services Center
Number of Buildings
One
Main Address
850 Hungerford Drive, Rockville, MD 20850
Site Developed
1951
Outside Occupants / Leased
Spaces
Date(s) of Visit
None
July 24, 2025
Management Point of Contact
Montgomery County Public Schools
Mr. Greg Kellner
Facilities Manager, Office of Facilities Management
Direct 240.740.7746
Gregory_Kellner@mcpsmd.org
On-site Point of Contact (POC)
Mr. Edward Philips
Building Service Manager
301.279.3498
Assessment and Report Prepared
By
Reviewed By
Kai Hollman
Daniel White, Technical Report Reviewer for,
Bill Champion
Program Manager
443.622.5067
Bill.Champion@bureauveritas.com
AssetCalc Link
Full dataset for this assessment can be found at:
https://www.assetcalc.net/
1
www.bvna.com | p 800.733.0660
CARVER EDUCATIONAL SERVICES CENTER
BUREAU VERITAS PROJECT: 172559.25R000-216.354
Campus Findings and Deficiencies
Historical Summary
Carver Educational Service Center, located at 850 Hungerford Drive, MD 20850, was established in 1951. The
building was originally a school for African American students; however, has since been converted to be
Montgomery County Administration Building.
Architectural
The brick façade was observed to be in fair condition. No major signs of deferred maintenance were observed
or reported during our assessment. However, exterior brick/masonry, cleaning and sealing are required in the
short-term. The roof built-up membrane shows signs of significant wear with evidence of leakage throughout
the top floor and will requires replacement. Additionally, about 40% of the windows have been replaced thus
far, the remaining 60% will need replacement during the evaluation period. The interior finishes have been
regularly replaced on an as-needed basis and are in fair condition.
Mechanical, Electrical, Plumbing and Fire (MEPF)
The building utilizes a central heating and cooling system that serves most spaces. The system consists of two
cooling towers that supply condenser water to two air-cooled chillers. Heating is provided by three gas-fired
boilers, which distribute hot water to radiators, unit ventilators, fan coil units, and air handlers located in the
mechanical rooms throughout the facility. Moreover, supplemental heating and cooling is provided by split
system ductless units serving offices, data rooms, and other small or isolated areas. The heating and cooling
system was observed to be in fair and poor condition, with some systems that have already exceeded their
estimated useful life (EUL). Exhaust ventilation is provided by roof mounted exhaust fans that will require
lifecycle replacement within the study period. Hot water is provided by a gas-fired water heater located in the
boiler room. The plumbing fixtures were observed to be in fair condition and are currently in the middle of their
useful life. The electrical system is composed of main switchboards, panel boards and transformers. The
electrical branch wiring and components are approaching their useful life and will require replacement. The
lighting system currently utilizes linear fluorescent fixtures. The fire alarm system is currently in a fair condition
and operating sufficiently. The building utilizes a partial fire suppression system that was observed to be in fair
condition. The commercial kitchen equipment is generally in fair condition and will require replacement within
the study period. Typical lifecycle replacements and ongoing maintenance of the MEPF equipment are
budgeted and anticipated.
Site
The parking lots and sidewalks have been periodically repaved and sectionally replaced as needed over the
years. The concrete walkways pavement show alligator cracking, wear, and separation and will require
immediate repairs. Recommendations include mill and overlay, and seal and striping during the evaluation
period.
2
www.bvna.com | p 800.733.0660
CARVER EDUCATIONAL SERVICES CENTER
BUREAU VERITAS PROJECT: 172559.25R000-216.354
Facility Characteristic Survey
The facility characteristics of school and associated buildings are shown below.
Indoor air quality including temperature and relative humidity level are monitored centrally. Most instructional
spaces are equipped with IAQ sensors. Each general and specialty classroom has a heating, ventilation, and
air conditioning (HVAC) system capable of maintaining a temperature between 68°F and 75°F and a relative
humidity between 30% and 60% at full occupancy. Each general, science, and fine-arts classroom had an
HVAC system that continuously moves air and is capable of maintaining a carbon dioxide level of not more
than 1,200 parts per million. The temperature, relative humidity and air quality were measured at a work
surface in the approximate center of the classroom.
The acoustics with the exception of physical-education spaces, each general and specialty classroom are
maintainable at a sustained background sound level of less than 55 decibels. The sound levels were measured
at a work surface in the approximate center of the classroom.
Each general and specialty classroom had a lighting system capable of maintaining at least 50 foot-candles of
well-distributed light. The school has appropriate task lighting in specialty classrooms where enhanced visibility
is required. The light levels measured at a work surface located in the approximate center of the classroom,
between clean light fixtures. The school makes efficient use of natural light for students, teachers, and energy
conversation.
Classroom spaces, including those for physical education, were sufficient for educational programs that are
appropriate for the class-level needs. With the exception of physical-education spaces, each general and
specialty classroom contained a work surface and seat for each student in the classroom. The work surface
and seat were appropriate for the normal activity of the class conducted in the room.
Each general and specialty classroom had an erasable surface and a surface suitable for projection purposes,
appropriate for group classroom instruction, and a display surface.
Each general and specialty classroom had storage for classroom materials or access to conveniently located
storage.
With the exception of physical-education spaces and music-education spaces, each general and specialty
classroom shall had a work surface and seat for the teacher and for any aide assigned to the classroom. The
classroom had secure storage for student records that is located in the classroom or is conveniently accessible
to the classroom.
The school was constructed with sustainable design practices. The schools use durable, timeless, low-
maintenance exterior materials. The school’s materials (particularly shell) should withstand time as well as
potential impacts related to structural, site and climate changes.
The school is functionally equitable. All students in this school have access to safe, well-maintained, and
appropriately equipped learning environments as students in other MCPS schools.
3
www.bvna.com | p 800.733.0660
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow Drug Demand Reduction Program (DDRP) Active Contract Opportunity Notice ID W50S8227QA002 Related

DEPT OF DEFENSE

Bid Due: 11/20/2026

Installation of New Bus Shelters & Associated Site Improvements Department: Finance & Administration

City of Gaithersburg

Bid Due: 12/09/2026

ID: BPM055432 Title: Granular Activated Carbon (GAC) water Filtration Systems Status: Open Due

State Government of Maryland

Bid Due: 11/30/2026

Follow VALVES Active Contract Opportunity Notice ID 70Z04027Q60515Y00 Related Notice Department/Ind. Agency HOMELAND

HOMELAND SECURITY, DEPARTMENT OF

Bid Due: 11/16/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.