| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-77017-NONST-2026-000000043 | 2025-IFB-304-Bear Creek Water Treatment Plant Sedimentation Basins Number 7 and 8 Plate Settlers | Douglasville-Douglas County Water & Sewer Authority |
Oct 08, 2025 @ 07:44 AM
|
Nov 05, 2025 @ 02:00 PM
|
Start Date: Oct 08, 2025 @ 07:44 AM ET
End Date:
Nov 05, 2025 @ 02:00 PM ET
INVITATION FOR BIDS
DOUGLASVILLE-DOUGLAS COUNTY WATER AND SEWER AUTHORITY
BEAR CREEK WATER TREATMENT PLANT
SEDIMENTATION BASINS NUMBER 7 AND 8
PLATE SETTLERS AND TRAC VACS
IFB #304
Sealed Bids will be received by the Authority at its Administrative
Offices located at 8763 Hospital Drive, Douglasville, Georgia
30134 until the date and time listed below for the project titled
BEAR CREEK WATER TREATMENT PLANT SEDIMENTATION BASINS NUMBER 7 AND
8 PLATE SETTLERS AND TRAC VACS, IFB #304. Bids shall be sealed and
mailed or delivered to the Authority so that they are received no
later than the date and time listed below. Bids received after
this time will not be accepted.
Bids shall be received by __2:00 PM, local time, on Wednesday,
November 5, 2025.
A non-mandatory pre-bid conference will be held at the Authority¿s
Administrative Offices located at 8763 Hospital Drive,
Douglasville, Georgia 30134 at_10:00 AM, local time, on Wednesday,
October 22, 2025.
Contractor shall hold a Utility Contractors License. The
appropriate State of Georgia Utility Contractors License Number
should appear on the face of the sealed bid envelope. Sealed bids
will be accepted at the Authority prior to the bid opening, but no
bid may be withdrawn after scheduled closing time for the period
of at least 60 days, except as allowed by state law.
The work to be accomplished consists of furnishing all materials,
equipment, personnel, plus perform all the necessary labor to
construct a complete and functioning project as follows:
The Contractor shall remove and dispose of off-site the existing
Tube Settlers and related items in Sedimentation Basins #7 and #8
and install the Authority-purchased Plate Settlers and related
items, modify existing Trac Vac Header, install new Trac Vac cable
drive, platforms, and electric cable drive units, and remove
existing air operated Trac Vac sludge valve and replace with new
Butterfly Valves with electric operators. Contractor shall remove
only one Sedimentation Basin
| Code | Description |
| 91381 | Maintenance and Repair, Sewer and Storm Drain, Including Removal |
| 91347 | Construction, Sidewalk and Driveway, Including Pedestrian and Handicap Ramps |
| 90961 | Maintenance and Repair, Non-Residential Building |
Joseph Morency
jmorency@ddcwsa.com
770-920-3864

With GovernmentContracts, you can:
...and Removal Services 91070 Sludge Removal Services, Building, Including Grease Trap Cleaning 91319... ...
State Government of Georgia
Bid Due: 6/29/2026
..., Disposal and or Treatment Services 91070 Sludge Removal Services, Building, Including Grease ...
State Government of Georgia
Bid Due: 6/30/2026
..., and Sludge Removal Services 96880 Traffic Sign Installation and Removal Services 96881 ...
State Government of Georgia
Bid Due: 6/12/2026
...Wells, etc., Electronic 96873 Storm Drain Cleaning, Repair, and Sludge Removal Services 91340...
State Government of Georgia
Bid Due: 6/19/2026