| Location: | New Mexico |
|---|---|
| Posted: | Mar 10, 2026 |
| Due: | Mar 12, 2026 |
| Agency: | Los Alamos County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB26-37 |
| Publication URL: | To access bid details, please log in. |
Project Description: The project consists of the replacement of approximately 6,700 linear feet of existing 14-inch steel water transmission line installed in 1949 along NM-502. Due to age-related deterioration and frequent leaks, the existing pipeline will be replaced with a new 14-inch ductile iron pipe. This line is a critical transmission main conveying water from Otowi Well #4 to the Townsite area of Los Alamos.

With GovernmentContracts, you can:
...ingestion pipelines, and dynamic reporting. Requested Information: What technologies would you showcase...
DEPT OF DEFENSE
Bid Due: 10/25/2026
...to portable units, so its advanced scanning technique and analysis pipeline add new ...
ENERGY, DEPARTMENT OF
Bid Due: 10/01/2026
...at the atomic scale can be combined with mesoscale modeling to feed broader ...
ENERGY, DEPARTMENT OF
Bid Due: 3/01/2027
...of the chemistry is an AI/ML-based real-time control pipeline that monitors sealing progress ...
ENERGY, DEPARTMENT OF
Bid Due: 10/01/2026