| Location: | Virginia |
|---|---|
| Posted: | May 23, 2026 |
| Due: | Jun 4, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912DY26RA086 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The objective of this Performance Work Statement is to plan and complete the environmental sampling of facilities at the installation. The structures of concern are listed in Table I. The sampling will determine ACM and ORM materials and complete a Waste Stream Analysis for RCRA 8 metals, lead-based paint (LBP) and PCB’s-in-paint for those parts of the structure currently identified as potentially having any painted components. Following sampling, the Contractor shall be able to completely quantify the environmental contamination present and the methods required to remove and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with Federal, State, and local regulations for the installation. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. Laboratory testing and analysis shall be completed within the workdays identified in table two following the respective site sampling field activity completion. The results of the site investigation and sampling effort will be provided in an individual Pre-Demolition Assessment Report for the installation that will be submitted within the workdays identified in table two following the receipt of sample results. The intent of this contract effort is to provide comprehensive sampling for all ACM/ORM materials to include the facility exterior, roof, basement/crawl spaces, etc. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within given structures that were not accessible during the survey and state the size of the area not accessed, and current or immediate previous use of the area not sampled.

With GovernmentContracts, you can:
...IFB 2000004382 - Switchgear Testing and Preventati... Status: Open IFB 120129 County of ...
State Government of Virginia
Bid Due: 6/09/2026
...inspections and testing for four (4) Underground Storage Tanks (USTs): UT-4, UT-5, UT-41, ...
DEPT OF DEFENSE
Bid Due: 6/05/2026
...IFB 2000004382 - Switchgear Testing and Preventati... Status: Open IFB 120129-1 County of ...
State Government of Virginia
Bid Due: 6/09/2026
...Project: Switchgear Testing & Preventative Maintenance Ref. #: IFB 2000004382 Type: IFB Status... ...
Fairfax County
Bid Due: 6/09/2026