| Location: | Georgia |
|---|---|
| Posted: | Oct 24, 2024 |
| Due: | Nov 14, 2024 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-66243-NONST-2025-000000046 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-66243-NONST-2025-000000046 | Bid 2025-17 - F Satterfield WPCP - ADDENDUM NO. 1 | Perry, City Of |
Oct 24, 2024 @ 08:23 AM
|
Nov 14, 2024 @ 02:00 PM
|
Start Date: Oct 24, 2024 @ 08:23 AM ET
End Date:
Nov 14, 2024 @ 02:00 PM ET
ADDENDUM NO. 1
For The
FRANK SATTERFIELD WPCP EXPANSION TO 3.6 MGD
CITY OF PERRY
PERRY BID NO. 2025-17
Specifications
Item No. 1-1:
Specification 00 01 00 ¿ INVITATION TO BID.
Modification: Replace Section 00 01 00, INVITATION TO BID, in its entirety with
ATTACHMENT AD1-1. The revised section changes the date of the bid opening to be
Thursday, November 14, 2024 at 2:00 PM.
Item No. 1-2:
Specification 01 10 00 ¿ SUMMARY OF WORK.
Addition: Add the following in Part 1.5.A.3.
b. The chlorine contact basin shall remain operational until all the canopies are constructed.
Item No. 1-3:
Specification 01 10 00 ¿ SUMMARY OF WORK.
Modification: Delete Part 1.6.B in its entirety and replace with the following:
B. Possible Sequence of Construction
1. Lime Pump
a. Install backflow preventer.
b. Install lime pump and associated piping.
2. Filters
a. Install the filter disks in the north filter basin.
b. Modify the effluent weir, influent weir, and backwash level.
c. Install the filter disks in the south filter basin.
d. Modify the effluent weir, influent weir, and backwash level.
3. UV System
a. Excavate and place the concrete.
b. Install canopy.
CITY OF PERRY
FRANK SATTERFIELD WPCP EXPANSION TO 3.6 MGD
SEPTEMBER 2024 033.55.1.21 00 01 00 - 1
ATTACHMENT AD1-1
SECTION 00 01 00
INVITATION TO BID
PART 1: GENERAL
1.1 Competitive Cost Sealed Bids
Separate sealed Bids for construction of Frank Satterfield WPCP Expansion to 3.6 MGD for
the City of Perry (Bid Number 2025-17) will be received until Thursday, November 14, 2024
at 2:00 PM in Perry City Hall, 1211 Washington Street, Perry, GA 31069. Bids will then be
publicly opened and read aloud at said office. Any bid received after Thursday, November14,
2024 at 2:00 PM will not be considered by the Owner. Following the closing time for the receipt
of bids, no bid may be withdrawn for a period of sixty (60) days.
1.2 Scope of Work
The work to be performed and provided under this Contract shall consist of furnishing all labor,
materials, t
| Code | Description |
| 91359 | Construction and Upgrades, Wastewater Treatment Plant |
| 91391 | Maintenance and Repair, Wastewater Treatment Plant |
| 96896 | Water and Wastewater Treatment Services |
| 96895 | Wastewater Treatment Plant, Operations, and Testing |
Joni Ary
joni.ary@perry-ga.gov
478-988-2715

With GovernmentContracts, you can:
...and construct complete in place and ready to operate the rehabilitation of an ...
Chatham County
Bid Due: 6/30/2026
...and construct complete in place and ready to operate the rehabilitation of an ...
Chatham County
Bid Due: 6/23/2026
...the rehabilitation of an existing wastewater lift station, controls, bypass generator receptacle, skid/frame... ...
State Government of Georgia
Bid Due: 6/23/2026
..., Marietta, Georgia 30068, and the Groover Mountain Pump Station (Groover Mountain PS), ...
State Government of Georgia
Bid Due: 7/08/2026