| Location: | North Carolina |
|---|---|
| Posted: | Aug 20, 2025 |
| Due: | Sep 19, 2025 |
| Agency: | North Carolina State University |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Institution | UNC Greensboro | |||||
|
Institution URL for Additional
Information about this Project (Optional) |
https://fac.uncg.edu/wp-content/uploads/20250815_Campus-Elevators_Designer-Ad_REV.pdf | |||||
| Project Name | Campus Elevators Replacements, Renovations and Upgrades | |||||
| Type of Services | Architectural/Engineering | |||||
| Project Manager | Kurt Melvin | |||||
| Phone Number | (336) 334-5998 | |||||
| Contact Email | k_melvin@uncg.edu | |||||
| Closing Date | 09/19/2025 | |||||
| Project Budget |
|
|||||
| Project Description |
One-Two Sentences
UNC Greensboro is seeking letters of interest from qualified licensed professionals for the project entitled, UNCG Campus Elevator Replacements, Renovations and Upgrades. The scope of this project is to repair, replace and/or add elevators located in five campus buildings. The professional services will include full design, including assessment of existing conditions, and construction services for the successful installation, operation, and complete support system functionality such as: code required, cloud based, car emergency signaling and communication devices. The design team will prepare separate bid packages for each of the following elevators: - Coleman HHP #1 - 4 Stop Elevator Modernization, including all required support systems and utilities - Coleman HHP #2 - 7 Stop Elevator Modernization, including all required support systems and utilities - Ferguson Building - 3 Stop Elevator Modernization, including all required support systems and utilities - Graham Building - 4 Stop Elevator within a new Building Addition, including all required support systems and utilities. The new addition's design shall coordinate and/or match the existing building's architectural materials and style. - MHRA Building - 4 Stop New Elevator within existing vacant elevator shaft Please see link above for additional submission information. Letters of Interest due by 12:00 p.m. on September 19, 2025
|
|||||
|
Submit Letters of Interest
and Current SF-330 to: |
(Contact Person, Name of Institution & Address)
Kurt Melvin UNC Greensboro Facilities Design & Construction Submissions are only being accepted via email: fdc@uncg.edu
|

With GovernmentContracts, you can:
...-and-construction/index.html Project Name Hauser Hall Renovation and Addition - Bid Package #2...
North Carolina State University
Bid Due: 6/18/2026
...: Hauser Hall Renovation and Addition - Bid Package #2: Balance of Construction ...
State Government of North Carolina
Bid Due: 6/18/2026
...-story, 12,629 SF arts center building and the renovation of the remaining building. ...
State Government of North Carolina
Bid Due: 6/12/2026
...(Optional) https://facilities.ofa.ncsu.edu/category/ads/ Project Name B121 Burlington Lab Renovation... Bidding from prequalified firms on ...
North Carolina State University
Bid Due: 6/25/2026