| Location: | North Carolina |
|---|---|
| Posted: | Aug 20, 2025 |
| Due: | Sep 19, 2025 |
| Agency: | North Carolina State University |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Institution | UNC Greensboro | |||||
|
Institution URL for Additional
Information about this Project (Optional) |
https://fac.uncg.edu/wp-content/uploads/20250815_Campus-Elevators_Designer-Ad_REV.pdf | |||||
| Project Name | Campus Elevators Replacements, Renovations and Upgrades | |||||
| Type of Services | Architectural/Engineering | |||||
| Project Manager | Kurt Melvin | |||||
| Phone Number | (336) 334-5998 | |||||
| Contact Email | k_melvin@uncg.edu | |||||
| Closing Date | 09/19/2025 | |||||
| Project Budget |
|
|||||
| Project Description |
One-Two Sentences
UNC Greensboro is seeking letters of interest from qualified licensed professionals for the project entitled, UNCG Campus Elevator Replacements, Renovations and Upgrades. The scope of this project is to repair, replace and/or add elevators located in five campus buildings. The professional services will include full design, including assessment of existing conditions, and construction services for the successful installation, operation, and complete support system functionality such as: code required, cloud based, car emergency signaling and communication devices. The design team will prepare separate bid packages for each of the following elevators: - Coleman HHP #1 - 4 Stop Elevator Modernization, including all required support systems and utilities - Coleman HHP #2 - 7 Stop Elevator Modernization, including all required support systems and utilities - Ferguson Building - 3 Stop Elevator Modernization, including all required support systems and utilities - Graham Building - 4 Stop Elevator within a new Building Addition, including all required support systems and utilities. The new addition's design shall coordinate and/or match the existing building's architectural materials and style. - MHRA Building - 4 Stop New Elevator within existing vacant elevator shaft Please see link above for additional submission information. Letters of Interest due by 12:00 p.m. on September 19, 2025
|
|||||
|
Submit Letters of Interest
and Current SF-330 to: |
(Contact Person, Name of Institution & Address)
Kurt Melvin UNC Greensboro Facilities Design & Construction Submissions are only being accepted via email: fdc@uncg.edu
|

With GovernmentContracts, you can:
...Bid Number: PW-2026-TH Bid Title: RFQ for Architectural and Engineering Design Services New ...
Town of Carrboro
Bid Due: 10/09/2026
...Department is seeking Design / Build services to perform Architectural, Engineering and Construction... ...
City of Durham
Bid Due: 4/18/2028
...Bid Title: Request for Qualifications for Professional Architectural & Engineering Services... Transfer Station ...
Gaston County
Bid Due: 10/05/2026
..., and a two-story waterslide. The building's architectural design is highlighted by an ...
State Government of North Carolina
Bid Due: 10/08/2026