| Location: | Vermont |
|---|---|
| Posted: | Jan 9, 2025 |
| Due: | Feb 19, 2025 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Request for Proposal Locations: Franklin Keywords: Construction (Non Building), Culvert Replacement, General Contractor, Road Construction Bid Description: STATE OF VERMONT Department of Buildings & General Services REQUEST FOR PROPOSALS ANR - Forests, Parks and Recreation Kill Kare State Park Entrance Road Improvements INVITATION TO BID DEPARTMENT OF BUILDINGS AND GENERAL SERVICES STATE OF VERMONT Contractors are invited to bid on the Kill Kare State Park Entrance Road Improvements Project for Buildings and General Services on behalf of the Agency of Natural Resources – Forests, Parks and Recreation at 2714 Hathaway Road in St. Albans Town, Vermont. This project consists of, but is not limited to: Roadway/parking area improvements, and ditching/drainage improvements. Full depth reclamation to a depth of 8” is proposed in the designated areas, followed by placement of 2” of Type IIS base course and 1-1/2” Type IIIS top course of bituminous pavement. Ditching/drainage improvements will consist of deepening and either stone lining (>5% slopes) or grass lining with erosion control blanket placement (removal of shoulder berms preventing proper drainage, in locations as indicated on the drawings. Three culverts will be replaced as part of this project. The existing deteriorated asphalt parking area for the Ferry access will be reclaimed to a finished gravel surface regraded to promote sheet flow. All work shall be conducted in accordance with VAOT 2024 Standard Specifications for Construction. Sealed Bids accompanied by proper Bid Security shall be emailed to the Department of Buildings and General Services, at BGS.VTBids@vermont.gov, until February 19, 2025 at 4:30 PM. Documents may be obtained from Blueprints Etc, 20 Farrell Street, South Burlington VT 05403, by phone at 802- 865-4503, by fax at 802-865-0027 or email to: orders@blueprintsetc.com. Project Manuals and Plans are available for preview at: http://www.blueprintsetc.com in the Public Plan Room. Any and all notifications, releases and addendums associated with this project will be posted at http://www.blueprintsetc.com. There is a non-refundable fee for each set of documents purchased. Fee to Include one (1) Hard Copy & one (1) Digital CD-ROM Copy: $TBD 1. Please be advised that all notifications, releases, and addendums associated with this RFP will be posted on-line in the plan room where the original solicitation resides unless otherwise determined that a hard copy is necessary. The state will make no attempt to contact contractors with updated information. It is the responsibility of each contractor to periodically check the posting site for any and all notifications, releases and addendums associated with the RFP. 2. NOTE: On occasion hard copy addendums may be required due to size or type of media/requirements. If applicable and as determined by the Department of Buildings and General Services, addendums that require hard copy distribution, a copy of such addenda will be mailed or delivered for each set of plans and specifications issued to the bidders, prior to the bid date. However, it is the responsibility of the bidder to be sure they have received all addenda and must so state the number of addenda they have received on the proposal. 3. If Bidders choose to pull information from other third-party sites, Bidders’ do so at their own risk as there is one official source of information for documents as indicated above. There will be a non-mandatory pre-bid meeting at the site on January 29, 2025 at 10:00 AM. Meet beyond the Park Contact Station at the end of Hathaway Point Drive, St. Albans, VT. QUESTION AND ANSWER PERIOD: Any vendor requiring clarification of any section of this RFP or wishing to comment or take exception to any requirements of the RFP must submit specific questions in writing to BGS.OPCVendorDocs@vermont.gov no later than 4:30 PM on February 5, 2025. All questions should include Kill Kare State Park Entrance Road Improvements Project in the subject line. Any comments, questions, or exceptions not raised in writing on or before the last day of the question period are waived. At the close of the question period a copy of all questions or comments and the State's responses will be posted at http://www.blueprintsetc.com. Every effort will be made to post this information as soon as possible after the question period ends, contingent on the number and complexity of the questions. Bidder’s attention is directed to: 1. General Conditions for Construction Contracts. It is the Bidder’s responsibility to thoroughly read and comply with all requirements. Please pay close attention due to changes that have been made. 2. Funding Source: This project is being funded, in whole or in part, through the American Rescue Plan Act (ARPA) funds and/or Vermont Capital Construction Act funds. 3. NOTICE TO BIDDERS – PROHIBITION OF RUSSIAN GOODS: The Contractor is hereby notified that, pursuant to Vermont Executive Order No. 02-22, dated March 3, 2022, the purchase of Russian-sourced goods and goods produced by Russian entities (defined as institutions or companies that are headquartered in Russia or have their principal place of business in Russia) is prohibited. The awarded Contractor must fill out and sign the Executive Order 02-22 Vendor Certification as part of the Contract awarding process. This certification is required for all subcontracts for work performed solely for the State of Vermont and subcontracts for work performed in the State of Vermont. 4. BID SUBMISSION INSTRUCTIONS: a. CLOSING DATE: Bids must be received by the State by the due date specified on the front page of this RFP. Late bids will not be considered. i. The State may, for cause, issue an addendum to change the date and/or time when bids are due. If a change is made, the State will inform all bidders by posting at the webpage indicated on the front page of this RFP. ii. There will not be a public bid opening. However, the State will record the name, city and state for any and all bids received by the due date. b. BID DELIVERY INSTRUCTIONS: i. ELECTRONIC: Electronic bids will be accepted. ii. E-MAIL BIDS. Emailed bids will be accepted. Bids will be accepted via email submission to BGS.VTBids@vermont.gov . Bids must consist of a single email with a single, digitally searchable PDF attachment containing all components of the bid. Multiple emails and/or multiple attachments will not be accepted. There is an attachment size limit of 40 MB. It is the Bidder’s responsibility to compress the PDF file containing its bid, if necessary, in order to meet this size limitation. It is also the Bidder's responsibility to ensure that their own email system can send and receive messages up to this size. iii. FAX BIDS: Faxed bids will not be accepted. iv. PAPER BIDS: Paper format bids will not be accepted. 5. Full Bonding is required for this job. 6. CONSTRUCTION CONTRACTOR EVALUATION FORM: The Department of Buildings and General Services (BGS) may require contractor evaluations on construction projects over $100,000 or at the discretion of the BGS Director. Evaluations will be used to compile contractor’s performance on BGS projects to provide a history and assessment of the contractor’s performance. 7. It is the Bidder’s responsibility to thoroughly read and comply with all instructions and requirements of this bid solicitation. WHEN SUBMITTING A BID, PLEASE EMAIL THAT BID TO BGS.VTBIDS@VERMONT.GOV PLEASE PUT YOUR COMPANY NAME IN THE SUBJECT LINE!!!
|
||||||||||||||||||||

With GovernmentContracts, you can:
...of an access road, grass-lined swale, terraced gravel wetland with associated drainage structures...
Town of Williston
Bid Due: 6/12/2026