| Location: | Alaska |
|---|---|
| Posted: | Mar 10, 2026 |
| Due: | Mar 26, 2026 |
| Agency: | Southcentral Foundation (SCF) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Southcentral Foundation (SCF) is pleased to provide this public notice regarding the solicitation of detailed proposals from Bidders interested in providing for K’kuyaqa Niltu (formerly known as Dr. Katherine and Dr. Kevin Gottlieb Building) on the Alaska Native Medical Center Campus at 4441 Diplomacy Drive, Anchorage, AK 99508. Contractors will review existing conditions and prepare a bid based on the information contained in this project manual and the drawings dated December 18, 2025.
Notice of this ITB will remain posted until deadline for proposal submittal. All information and details regarding this ITB are as presented in the RFP document, provided here in Adobe Acrobat format.
INVITATION TO BID – SCF26-1190 Specialty Leadership Team Integrated Care Team Tenant Improvement
ITB Release date: March 10th , 2026
ITB Due Date: March 26th, 2026 @ 2pm AKST
IMPORTANT NOTICE TO BIDDERS: Bidders must register with the SCF Contact Person via email using the link below. Failure to register with the SCF Contact Person may result in the rejection of a proposal.
ITB-Specialty Leadership Team Integrated Care
Team Tenant Improvement Project SCF26-1190
Invitation to Bid
ITB 03/10/26
ITB26-1190 SLT ICT TI Project SECTION 00 01 01
PROJECT DIRECTORY
PROJECT DIRECTORY
OWNER
SOUTHCENTRAL FOUNDATION
4501 DIPLOMACY DRIVE
ANCHORAGE, AK 99508
P (907) 729-4955
PROJECT MANAGER
SOUTHCENTRAL FOUNDATION
Rayn Aaberg
PROJECT MANAGER
4155 TUDOR CENTRE DRIVE
ANCHORAGE, AK 99508
P (907) 301-7972
ITB ADMINISTRATOR
SOUTHCENTRAL FOUNDATION
Donovan Fairbanks
7033 E Tudor Road
ANCHORAGE, AK 99507
P (907) 729-6613
dfairbanks@southcentralfoundation.com
ARCHITECT
ARCHITECTS ALASKA
Ann Byker
Principal Architect
900 West 5th Ave., Suite
403
ANCHORAGE AK, 99501
D (907) 272-3567
P (907) 865-9324
AByker@architectsalaska.com
SCF Division 00 00 01 01 - 1 Project Directory
SCF Division 00 00 01 10 - 1 Table of Contents
SUPPLEMENTARY DOCUMENTS
* 251218 SCF SLT ICT Permit Drawings.PDF
* 21.003.04 SCF SLT ICT_100pct Specifications.PDF
* AIA Document A104 - 2017 -SCF Modified Sample.PDF
SCF Division 00 00 01 10 - 1 Table of Contents
INVITATION TO BIDDERS - SCF26 1190 Specialty Leadership Team
Integrated Care Team Tenant Improvement (referred to SLT ICT TI
thereafter)
Project ISSUE DATE: 03-10-26
Southcentral Foundation will receive electronic (PDF) for the Southcentral Foundation (SCF)
Specialty Leadership Team Integrated Care Team Tenant Improvement (SLT ICT TI) Project,
on the 2nd floor located at 4441 Diplomacy Drive, Anchorage, AK 99508. Bids should be sent to
Southcentral Foundation's ITB Administrator, SCFPurchasing@southcentralfoundation.com.
Bids must be received by 03/26/26, at 2:00 PM Alaska Standard Time (AKST). Bids will
then be publicly opened and will be evaluated by select Southcentral Foundation Staff. Bids
submitted after the date and time listed above will not be considered. A notification email will
be sent to all bidders upon evaluation and selection of the winning bidder.
General Scope of Work: Southcentral Foundation SLT ICT TI Project at 4441 Diplomacy
Drive, Anchorage, AK 99508. The work shall begin April 2026 and be completed no later than
September 15, 2026. Contractors will review existing conditions and prepare a bid based on
the information contained in the drawings (supplementary pdf) dated December 18, 2025, and
information included in these Bid Documents. Additionally, the contractor shall comply with
Southcentral Foundation's administrative requirements of the contract, including the
submission of a project schedule, safety plan, schedule of values, daily reports, submittals, and
other tasks required under the contract. The Bid documents and Construction documents files
are available on SCF's website at: Procurement and Contracts - Southcentral Foundation. It is
the bidder's responsibility to check this site regularly for addenda and other information related
to this Invitation to Bid.
The Mandatory Pre-bid conference will be held on 03/18/26 10AM at 4441 Diplomacy Drive,
Anchorage, AK 99508. Registered bidder will receive pre-bid conference meeting location in
email.
Alaska Native / American Indian (AN/AI) preference in contracting is applicable and bidders
stating native preference must provide a completed statement and proof of Native ownership
with the bid. AN/AI owned firms will be awarded a 5% preference. Award of a firm, fixed-price
contract for the specified work will be made in accordance with Southcentral Foundation's
procurement policies. No bid shall be withdrawn for a period of thirty (30) days subsequent to
the submission date without the written consent of Southcentral Foundation.
Performance and Payment Bonds are required in an amount equal to 100% of the total Bid
Price. Use AIA Payment and Performance Bond forms A312-2010. All costs for Payment and
Performance Bonds shall be included in the Total Stipulated Sum Bid Price.
Southcentral Foundation reserves the right to reject any and all bids, accept other than the
lowest bid, and/or waive informalities or irregularities in bids received whenever such rejection,
acceptance, and/or waiver is in the best interest of Southcentral Foundation.
SCF Division 00 00 11 16 - 1 Invitation to Bidders
PART 1 - GENERAL
1.01 PROJECT GENERAL DESCRIPTION
Southcentral Foundation is solicitating bids for K'kuyaqa Niltu (formerly known as Dr.
Katherine and Dr. Kevin Gottlieb Building) on the Alaska Native Medical Center Campus at
4441 Diplomacy Drive, Anchorage, AK 99508. Contractors will review existing conditions and
prepare a bid based on the information contained in this project manual and the drawings
dated December 18, 2025.
Additionally, the contractor shall comply with all administrative requirements of the contract,
including the submission of a project schedule, safety plan, schedule of values, daily reports,
submittals, and other tasks required under the contract. Due to the occupied nature of the
adjacent building, non-disruptive work may commence Monday - Friday from 6:00 AM to 6:00
PM. Any disruptive work must be completed outside the hours indicated. General Contractor
is to complete scope of work adhering to Infection Control Risk Assessment (ICRA) per SCF
Division 1, 01 40 10.
Project Site
4441 Diplomacy Drive, Anchorage, AK 99508, 2nd Floor.
Project Schedule
Construction is anticipated to begin April 2026 with substantial completion by September 15,
2026.
Alaska Native/American Indian Preference
Alaska Native/American Indian "AN/AI" preference in contracting is applicable and bidders
stating native preference must provide a completed statement and proof of Native ownership
with the bid. AN/AI owned firms will be awarded a 5% preference. Award of a firm, fixed-price
contract for the specified work will be made in accordance with Southcentral Foundation's
procurement policies. No bid shall be withdrawn for a period of thirty (30) days subsequent to
the submission date without the written consent of Southcentral Foundation.
Owner Background
Southcentral Foundation (SCF) is an Alaska Native-owned healthcare organization serving an
estimated 56,146 Alaska Native and American Indian people living in Anchorage, the
Matanuska-Susitna Valley, and 60 rural villages in the Anchorage Service Unit (ASU). SCF's
first P.L. 638 contract with the Alaska Area Native Health Service began in 1984 to provide
dentistry, optometry, community health representatives and injury control services. Substance
abuse treatment was added in 1987.
In 1998, SCF assumed ownership and management of the Anchorage Native Primary Care
Center, which serves the entire Native population of the state - an estimated 130,682 people. In
January 1999, SCF and the Alaska Native Tribal Health Consortium signed an agreement to
take over management of the Alaska Native Medical Center from the Indian Health Service.
SCF Division 00 00 21 13 - 1 Instructions to Bidders
With this transition, Alaska became the first state in the nation to have all its health facilities for
Native Americans managed by Native organizations.
Project Team Members
The project scope includes coordination with SCF's Staff through SCF's Project Manager. The
Contractor is also responsible for project closeout including the provisions of Operations and
Maintenance Manuals and assignment of written warranties and guarantees as required in the
contract.
The SCF Project Manager will issue and evaluate all bids responding to this Invitation to Bid
(ITB), negotiate a contract with the successful Bidder in coordination with the SCF Contracts
Department, and administer the planning and construction of the project.
This Invitation to Bid (ITB) invites Bidders to respond to a fixed set of criteria for the project and
a Stipulated Price contract form. Within the framework of this ITB, the SCF Project Manager will
review bids to assess each Bidder's submitted price and capabilities to deliver a quality and
efficient project that is the most advantageous to the owner. This set of qualifications described
in detail in this ITB, will be considered a baseline by which submitted bids will be evaluated.
1.02 SPECIFIED DATES
Public Advertisement 03/10/26
Registration Deadline 03/17/26
Pre-bid Conference 03/18/26
Deadline to Submit Questions 03/20/26
SCF Response to Questions 03/23/26
Bids Due 03/26/26
Anticipated Notice of Intent to Award 03/27/26
Anticipated Notice to Proceed 04/06/26
1.03 RECEIPT AND OPENING OF BIDS
A. Electronic Submission of Bids:
Bidders shall submit an electronic copy by email to the SCF ITB Administrator at
SCFPurchasing@southcentralfoundation.com before the deadline. It is the
bidders responsibility to assure bid is received by SCF.
B. Time and Opening:
Bids must be submitted prior to the time specified in section 001116 of this ITB,
and the exact date and time of receipt will be recorded. Late submittals will not
be considered but will be held unopened until the time of notice of intent to award
SCF Division 00 00 21 13 - 2 Instructions to Bidders
and then returned to the sender unless other methods of disposition are
requested or agreed to by the sender. Bids will be opened at 7033 E. Tudor RD
Anchorage AK, 99507 at 03/26/26 2:00pm Alaska time specified in section
001116 of this ITB.
C. Facsimile/telegraphic/telephonic Bids
Facsimile/telegraphic/telephonic bids will not be considered.
D. Officer's Responsibility
No responsibility will attach to an officer or agent of Southcentral Foundation for
the premature opening of, or the failure to open a bid not properly addressed and
identified.
E. Bidder's Responsibility
Bidder shall register with Southcentral Foundation. Register by confirming your
intent to provide a bid, by emailing SCFPurchasing@southcentralfoundation.com
and include both the ITB number and title in your email when you register. The
bidder is also responsible for checking SCF's procurement website to obtain any
issued addenda, changes, and/or updates to the Invitation to Bid, prior to
submitting your bid, to assure compliance with the most up to date information.
1.04 WITHDRAWL OF BIDS
Bids may be withdrawn on written or telegraphic requests received from a Bidder
prior to the time specified for submittal. Bids not withdrawn prior to the specified
time may not be withdrawn for a period of thirty (30) days following the date
specified for submittal.
1.05 EXAMINATION OF PLANS, SPECIFICATIONS, AND SPECIAL PROVISIONS
A. The Bidder shall review all the proposed contract documents to ascertain all of
the requirements of the work.
SCF Division 00 00 21 13 - 3 Instructions to Bidders
B. The Bidder shall examine carefully this ITB and contract forms before
submitting a bid. The submission of a bid shall be an admission that
the Bidder has made such examination and is satisfied as to the conditions to be
encountered in performing the work and as to the requirements and terms of the
contract, and Southcentral Foundation will rely on such admissions.
C. For the convenience of interested prospective Bidders, complete sets of the
bid documents are on file at the following locations.
www.southcentralfoundation.com/about-us/procurement/
D. Southcentral Foundation will not issue sets of bid documents.
1.08 METHOD FOR CLARIFICATION
A. Any Bidder in doubt as to the true meaning of any part of the documents may
submit to SCF a written request for an interpretation thereof. All requests must be
submitted within the timeframe allowed by Section 002113 - Instructions to
Bidders. Questions can be emailed to
SCFPurchasing@SouthcentralFoundation.com
B. Questions will be answered by issuing an addendum to all Bidders prior to the
public bid opening. Southcentral Foundation will not be responsible for any
other explanation or interpretation of the documents made or given prior to
opening the bids.
1.09 PREPARATION AND SUBMISSION OF BIDS
A. Preparation and Submission:
Bids must be submitted on the forms furnished or copies thereof, and in
accordance with the Instructions to Bidders and must be manually or
electronically signed. To secure consideration, the bid must be submitted as
described in 1.03 A. The bid forms are provided within these bid documents
SCF Division 00 00 21 13 - 4 Instructions to Bidders
NOTICE TO BIDDERS: PLEASE REMOVE THIS SECTION AND FORMS LISTED BELOW
FROM THE REST OF THE MANUAL FOR SUBMISSION ON THE BID DUE DATE
All responsive Bids MUST contain the following:
1. 00 41 13 Bid Form - Stipulated Sum
2. 00 43 13 Bid Security Form
3. 00 45 14 Statement of Bidder's Qualifications
4. 00 45 19 Non-Collusion Affidavit
SCF Division 00 00 21 14 - 1 Bidders Checklist

With GovernmentContracts, you can: