| Location: | Colorado |
|---|---|
| Posted: | Sep 1, 2026 |
| Due: | Sep 15, 2026 |
| Agency: | AGRICULTURE, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 1240LT26Q0107 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
On September 1, 2026, amendment 0001 to solicitation 1240LT26Q0107 - GAOA LDV Crystal Lakes Water & Septic Resuscitation at Pikes National Forest has been posted to SAM.gov and accomplished the following:
1. Post RFI questions and answers labeled C05a RFI QA 1240LT26Q0107.
2. Post pre-bid sign in sheet labeled C05b Site Visit 2026.08.19.
This SF30 must be acknowledged and submitted with your proposal.
******************************************************************************************************************************************************
This project involves installing a new 2-inch HDPE waterline beneath Colorado Highway 24, including completing all Subsurface Utility Engineering required for CDOT permitting. Work includes connecting the new waterline from Dwelling 1 to the existing distribution system, replacing the well pump to provide a 15 GPM supply, installing a dual‑stage booster pump and basement water storage, and performing associated electrical upgrades such as relocating meters, burying service lines, upgrading panels, and supporting septic and booster pump systems. The project also replaces multiple septic systems serving the Blue House, Brown House, Bunkhouse, and Shop, installs new sewer and dosing infrastructure, and includes asphalt removal along with new road and gate installation.
| Aug 7, 2026 | [Combined Synopsis/Solicitation (Original)] GAOA LDV Crystal Lakes Water & Septic Resuscitation, PSICC, Colorado |

With GovernmentContracts, you can:
General Information Document ID IFB1-CAAA-2027000018-1 Status Open Description CTF FCF Grease Interceptor IFB1
State Government of Colorado
Bid Due: 10/01/2026
Description: C27DM4 - CMGC Pre-Const Services: SpCk Dam Rehab Proj Department: DNR -
State Government of Colorado
Bid Due: 6/30/2027
Follow Z1DA--554-26-106 Replace DW Valves. Active Contract Opportunity Notice ID 36C25926R0057 Related Notice
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 9/30/2026
Project ID: 26-055 Title: Roadway and Signalization Improvements - State Highway 45A (Pueblo
City of pueblo
Bid Due: 10/14/2026