| Location: | Arizona |
|---|---|
| Posted: | May 15, 2025 |
| Due: | May 30, 2025 |
| Agency: | TRANSPORTATION, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 6982AF25B000006 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE
Small Business Set-Aside
PROJECT NUMBER: AZ FLAP PIM FR510(1)
PROJECT NAME: Sabino Canyon Park
PROJECT DESCRIPTION:
Sabino Canyon Park Road, also known as Forest Road 510, is located within Pima County, Arizona, north of Tucson, Arizona. The project begins on the north at the intersection with Carter Canyon Road and ends at the Forest Service gate. The project length is approximately 0.5 mile.
SCOPE OF THE WORK:
The purpose of the project is to improve public access, particularly parking, in the community of Summerhaven, which is at the top of Mt. Lemmon, north of Tucson. Note that CFL built the road from Tucson to Summerhaven over several years and phases in the 90’s and 2000’s. It is very popular during the summer months to escape the Tucson heat. There is also an area where people ski slightly to the north of the project. This project includes the construction of a new paved parking lot consisting of approximately 75 parking spaces, a kiosk for Arizona Trail information, a public restroom, and the improvement of Sabino Canyon Park Road to accommodate approximately 21 new on-street parking spaces, an asphalt surface rehabilitation for approximately half a mile, and the installation of a 5-foot-wide pathway as part of the Arizona Trail. The project improvements will provide a new paved surface, roadway excavation, retaining wall construction, tree clearing, ditch construction/reconditioning to improve drainage, installation of culverts, a new public bathroom, and the installation of new street signage and pavement marking.
PRINCIPAL WORK ITEMS:
20401-0000 Roadway Excavation: 7,000 CUYD
25902-0000 Soil Nail Retaining Wall: 8,200 SQFT
30202-2000 Roadway Aggregate, Method 2: 1,800 TON
40301-0100 Asphalt Concrete Pavement, Type 1: 1,800 TON
60202-0600 36-Inch Equivalent Diameter Arch Pipe Culvert: 180 LNFT
60901-1700 Curb Concrete, 18-Inch Depth: 1,200 LNFT
60906-1000 Gutter, Concrete (Ditch): 750 SQYD
61501-0800 Sidewalk, Concrete: 1,100 SQYD
63501-0000 Temporary Traffic Control: LPSM
64603-1000 Fixture, Vault Toilet: 2 EACH
ANTICIPATED SCHEDULE:
Advertisement – June 2025
Award-July 2025
Construction – August 2025 through April 2026
ESTIMATED COST RANGE:
Between $5,000,000 and $10,000,000
| Jul 15, 2025 | [Solicitation (Original)] AZ FLAP PIM FR510(1) Sabino Canyon Park |
| Aug 7, 2025 | [Solicitation (Updated)] AZ FLAP PIM FR510(1) Sabino Canyon Park |
| Aug 12, 2025 | [Solicitation (Updated)] AZ FLAP PIM FR510(1) Sabino Canyon Park |
| Aug 13, 2025 | [Solicitation (Updated)] AZ FLAP PIM FR510(1) Sabino Canyon Park |
| Aug 18, 2025 | [Solicitation (Updated)] AZ FLAP PIM FR510(1) Sabino Canyon Park |
| Aug 20, 2025 | [Solicitation (Updated)] AZ FLAP PIM FR510(1) Sabino Canyon Park |
| Aug 22, 2025 | [Solicitation (Updated)] AZ FLAP PIM FR510(1) Sabino Canyon Park |
| Aug 26, 2025 | [Solicitation (Updated)] AZ FLAP PIM FR510(1) Sabino Canyon Park |
| Sep 5, 2025 | [Solicitation (Updated)] AZ FLAP PIM FR510(1) Sabino Canyon Park |

With GovernmentContracts, you can:
Follow Davis-Monthan AFB Paving IDIQ Contract Active Contract Opportunity Notice ID FA487726B0001 Related
DEPT OF DEFENSE
Bid Due: 6/11/2026
Follow Prescott Replace Steam Boilers (Project No. 649-22-104) Active Contract Opportunity Notice ID
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 7/01/2026
Project ID: RFQ 26-001 Title: Construction Manager at Risk (CMAR) Highland High School
Gilbert Public Schools
Bid Due: 6/18/2026
Follow Y1EZ--Correct FCA Deficiencies Construction -Amendment Active Contract Opportunity Notice ID 36C77026R0006 Related
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/10/2026