| Location: | North Carolina |
|---|---|
| Posted: | Oct 24, 2024 |
| Due: | Nov 8, 2024 |
| Agency: | State Government of North Carolina |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | SCO-Department of Environmental Quality – Marine Fisheries: Main Campus Dock Repairs |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | SCO-Department of Environmental Quality – Marine Fisheries: Main Campus Dock Repairs |
| Project Title: | Department of Environmental Quality – Marine Fisheries: Main Campus Dock Repairs (Morehead City) (RE-ADVERTISEMENT) |
| Description: | RE-ADVERTISEMENT. This project is for repairs to the existing main dock at the main campus of the Division of Marine Fisheries located in Morehead City, NC. The scope of work includes the replacement of 28 pilings that have received significant damage from pervious storms and hurricanes and 64 linear ft. of decking boards to be replaced on the 2 lower-level piers. The new dock will be constructed of hog slath decking. All lower bracing needs to be replaced along with 2 5 pile cluster dolphins on the main dock that have been deteriorated from the salt water and previous storms and hurricanes over 25 years and needs to be replaced. Replace 91 wave attenuators along with 23 whalers. |
| Opening Date: | 11/8/2024 4:00 PM |
| Posted Date: | 10/25/2024 |
| Status: | Open |
| Department: | STATE OF NC - CONSTRUCTION OFFICE |
|
Solicitation Number
*
SCO-Department of Environmental Quality – Marine Fisheries: Main Campus Dock Repairs
|
Department
STATE OF NC - CONSTRUCTION OFFICE
|
Status Reason
Open
|
|
|
Opening Date
2024-11-08T16:00:00.0000000
|
Posted Date
*
2024-10-24T19:05:37.0000000Z
|
Commodity Code
Design Services
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
—
|
||
|
Description
RE-ADVERTISEMENT. This project is for repairs to the existing main dock at the main campus of the Division of Marine Fisheries located in Morehead City, NC. The scope of work includes the replacement of 28 pilings that have received significant damage from pervious storms and hurricanes and 64 linear ft. of decking boards to be replaced on the 2 lower-level piers. The new dock will be constructed of hog slath decking. All lower bracing needs to be replaced along with 2 5 pile cluster dolphins on the main dock that have been deteriorated from the salt water and previous storms and hurricanes over 25 years and needs to be replaced. Replace 91 wave attenuators along with 23 whalers.
|
|||
|
Attachments
|
|||

With GovernmentContracts, you can:
...of 25 hurricane-rated windows Replacement of 4 exterior commercial doors Replacement of exterior... ...
DEPT OF DEFENSE
Bid Due: 6/12/2026
...hurricane-rated windows Replacement of 4 exterior commercial doors Replacement of exterior staircase.../hurricane-resistant construction ...
DEPT OF DEFENSE
Bid Due: 6/12/2026
...of approximately 5,893 sq. ft. of siding, soffit, and trim Replacement of 25 ...
DEPT OF DEFENSE
Bid Due: 6/12/2026
...shall be designed to meet High-Velocity Hurricane Zone (HVHZ) Requirements, ASTM E1996,/TAS 201 ...
County of Carteret
Bid Due: 7/23/2026