| Location: | Massachusetts |
|---|---|
| Posted: | Sep 16, 2025 |
| Due: | Oct 29, 2025 |
| Agency: | Town of Barnstable Invitation |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FY26-IFB-022 - General Contractor |
| Publication URL: | To access bid details, please log in. |
Project Description: FY26 Coal Bin Renovation Town Hall General Contractors (GC's). General Contractor DCAMM Certification Category of General Building Construction Required.
The work to be performed under this contract includes, but is not limited to, the first phase of the HVAC system upgrade for the Town Hall. There is HVAC equipment replacement, structural work related to the old coal bin, infill of the below grade coal pit, and site work in preparation for the final phase of work related to the renovation and HVAC upgrade to the Town Hall.
The scope of work includes:
a. Demolition of the existing below grade coal bin
b. Concrete work
c. Carpentry, waterproofing, damp proofing, caulking
d. Mechanical, plumbing, and electrical
e. Sitework and utility work.

With GovernmentContracts, you can:
...) or Mechanical Prime SUBTRADES Section 220001 Plumbing Section 260001 Electrical Work Filed ...
Commonwealth of Massachusetts
Bid Due: 6/22/2026
...that protects historic fabric and ensures compatibility with existing mechanical, electrical...- PLUMBING, HEATING, ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 7/08/2026
...mechanical upgrades including new plumbing, septic system, electrical system, and heating system. The...
INTERIOR, DEPARTMENT OF THE
Bid Due: 7/10/2026