| Location: | South Carolina |
|---|---|
| Posted: | Mar 24, 2025 |
| Due: | Apr 15, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | H24-9656-LC |
| Publication URL: | To access bid details, please log in. |
The project includes: sitework, landscaping, structural systems, fire protection, mechanical, electrical, and plumbing systems. The scope includes full interior demolition and selective exterior demolition. Phasing Requirement - The first floor office space (approximately 9,500 square feet must be completed by November 15, 2025) Bidders are required to identify this portion in their proposals and include it as a separate phase in their schedule

With GovernmentContracts, you can:
...: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Jamie Caggiano Email... Conference ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/30/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: $475,000 to $575,000 Prime Contractor... to fully ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/19/2026
...systems, including HVAC, electrical, plumbing, life safety, and IT infrastructure. Project Details... systems, ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/05/2026
..., Ruffin, SC 29475 Project Delivery Method: Design-Bid-Build Construction Cost Range: $135,000-$160,000... that ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/14/2026