| Location: | Federal |
|---|---|
| Posted: | Oct 10, 2025 |
| Due: | Nov 10, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | SPE7MX-21-D-0057 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The subject requirement is for the acquisition of 161 National Stock Numbers (NSNs), listed within the applicable synopsis attachment. In addition to these NSNs, the scope of this contract includes all DLA-managed, consumable NSNs for which Raytheon Technologies is the only approved source of supply. These requirements will continue to support multiple weapon system programs including, but not limited to B-1B BOMBER, AIRCRAFT, TOMCAT F-14, P-3 ORION, WASP CLASS LHD, AIRCRAFT, PHANTOM F-4, SUB ACOUSTIC SONAR SYS, MISSILE, PATRIOT, LAUNCHER, F-22 RAPTOR AIR DOMINANCE FIGHTER.
This Add-On #1 will continue to support the scope of this Corporate Consumables Contract for the remaining 5 years, 4 months of the Firm-Fixed-Price contract, with two price redetermination periods.
Specifications cannot be provided by DLA Weapons Support. Hard copies are not available. There are no technical drawings/bid sets available.
Solicitation SPE7MX20R0130 - Other than Full & Open Competition IAW 10 U.S.C. 2304(c)(1).
The Government is using the polices contained in FAR Part 15 – Contracting by Negotiation for the described supplies.
The FSCs of this requirement are contained in attachment 1.

With GovernmentContracts, you can:
...: N041 - INSTALLATION OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT...-in ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 7/15/2026
...on the property side of the buffalo box. Said removal of buildings, equipment ...
MPN
Bid Due: 12/19/2078
...of buildings, equipment and material shall be cleared off within ten (10) days ...
MPN
Bid Due: 10/17/2070
...of buildings, equipment and material shall be cleared off within ten (10) days ...
MPN
Bid Due: 12/19/2079