| Location: | South Carolina |
|---|---|
| Posted: | Nov 5, 2025 |
| Due: | Dec 3, 2025 |
| Agency: | Beaufort - Jasper Water & Sewer Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2026-IFB-009 |
| Publication URL: | To access bid details, please log in. |
Project Description: Beaufort Jasper Water & Sewer Authority (BJWSA) is requesting bids for the Port Royal Water Reclamation Facility – Secondary Clarifiers. The Project consists of furnishing all materials required to replace secondary clarifier equipment suitable for gravity separation of mixed liquor solids in the activated sludge process in two (2) secondary clarifiers at the Port Royal Island Water Reclamation Facility (PRIWRF). The scope of work includes reviewing as-builts drawings; survey and measurement of existing basins; design, manufacture and delivery of equipment; start-up services and training as outlined in the IFB.

With GovernmentContracts, you can:
...: Construction and Industrial Trades Training Facility Anticipated Project Delivery Method: Design-Bid... Project ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 10/07/2026
...: McCrady Training Center, Eastover, SC Project Delivery Method: Design-Bid-Build Construction Cost Range... ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/24/2026
...Project Location: McCrady Training Center, Eastover, SC Project Delivery Method: Design-Bid-Build... Project Name: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 10/01/2026
...Corner, SC Anticipated Project Delivery Method: Design-Bid-Build Agency Project Coordinator: Jeff... architectural firm ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 10/16/2026