Hiner Spring Quarry Development, White River National Forest, Blanco Ranger District, Rio Blanco County, Colorado

Location: Colorado
Posted: Mar 25, 2025
Due: Apr 10, 2025
Agency: AGRICULTURE, DEPARTMENT OF
Type of Government: Federal
Category:
  • 56 - Construction and Building Materials
Solicitation No: 1148809
Publication URL: To access bid details, please log in.
Follow
Hiner Spring Quarry Development, White River National Forest, Blanco Ranger District, Rio Blanco County, Colorado
Active
Contract Opportunity
Notice ID
1148809
Related Notice
Department/Ind. Agency
AGRICULTURE, DEPARTMENT OF
Sub-tier
FOREST SERVICE
Office
USDA FOREST SERVICE-SPOC IM
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Presolicitation (Original)
  • Original Published Date: Mar 25, 2025 02:36 pm CDT
  • Original Response Date: Apr 10, 2025 09:00 am CDT
  • Inactive Policy: 15 days after response date
  • Original Inactive Date: Apr 25, 2025
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: 5610 - MINERAL CONSTRUCTION MATERIALS, BULK
  • NAICS Code:
    • 212312 - Crushed and Broken Limestone Mining and Quarrying
  • Place of Performance:
    Meeker , CO 81641
    USA
Description

PRESOLICITATION NOTICE ONLY, THIS IS NOT A SOLICITATION



Project Title: Hiner Spring Quarry Development, White River National Forest, Blanco Ranger District, Rio Blanco County, Colorado



1. Introduction.



This pre-solicitation notice is for information only and is not a commitment by the Government to solicit contractual offers or award contracts. The Government is not soliciting, nor will it accept proposals as a result of this presolicitation. If a competitive solicitation is issued in the future, it will be announced via The System for Award Management (SAM) at SAM.gov and interested parties must comply with that announcement. The Government will not reimburse respondents for any questions submitted or information provided as a result of this notice. This is not a solicitation or a promise to issue a solicitation, and this information is subject to modification and in no way binds the Government to award a contract.



2. Applicable North American Industry Classification System (NAICS) Code.



The applicable NAICS CODE: 212312 – Crushed and Broken Limestone Mining and Quarrying



Size Standard for NAICS: 750 Employees



3. Type of Contract to be Awarded.



As a result of this presolicitation and possible solicitation, the Special Project Operations Center, Intermountain Branch, plans to award a firm fixed price contract.



4. Type of Solicitation.



The solicitation, if released, will be governed by Federal Acquisition Regulation Part 15, “Contracting by Negotiation”.



5. Presolicitation Posting Period.



This presolicitation will be posted for 16 days.



6. Contracting Office Points of Contact.



Holly Hlavac, Contract Specialist, Holly.Hlavac@usda.gov



7. Contract Description.



This project consists of the following major items of work on the Blanco Ranger District:




  • Mobilization

  • Soil erosion and pollution control work.

  • Drainage excavation on pit access road.

  • Controlled rock blasting may be required for production and oversize material.

  • Produce and stockpile aggregate surface course gradation (FSSS 703-3 Table).

  • The Government estimates a swell factor of 30% (in-place to crushed), and loss factors of approximately 5% in stockpiling and 20% in crushing. The quantities shown in the schedule of items do not include losses for stockpiling and crushing and are final accepted material quantities.



Approximately 24,000 cubic yards of surface course gradation (FSSS 703-3) aggregate may be ordered. Material will be produced and stockpiled using crushing and screening methods. Partial quantities from the base and/or option item(s) may be ordered. Controlled blasting is anticipated and may be required for production and oversize material. The quarry will be developed within the existing disturbance, and no new clearing or grubbing of vegetation is expected to take place for this work. Soil erosion and pollution control work will be performed. Two cross ditches with lead outs will be constructed on the pit access road. Rounding of cut slopes and final shaping of the pit area to drain shall be completed prior to final acceptance



8. Project Location.



The Hiner Spring Quarry is located off Forest Road 601.1 (Blair Mountain), approximately 1.12 miles South-East from the intersection of Forest Road 245.1 (Buford – New Castle).



Latitude; 39.8374358, Longitude; -107.5649245



From New Castle, Colorado, turn North on 7th street and continue onto county road 245 for 29.1 miles. Turn Right onto Forest Road 601 towards Meadow Lake and continue for 1.3 miles and turn left onto the Hiner Spring Quarry access road.



9. Estimated Period of Performance.



June 16, 2025, through October 15, 2025



10. Disclosure of Magnitude.



The anticipated magnitude for this project is between $250,000 and $500,000.



11. Type of Set-aside.



Total small business set-aside.



12. Responses.



Interested and capable sources are encouraged to respond to this presolicitation with a Statement of Capability. In addition to a Statement of Capabilities, firms responding to this announcement should include Company Name, Unique Entity Identification, Point of Contact, Address, and indicate whether they are a Small Business, 8(a) Concern, Veteran-Owned Small Business, Service-Disabled Veteran-Owned Business, HUBZone Small Business, Small Disadvantaged Business, or Women-Owned Small Business. Responses are due within 16 days of this presolicitation and should be submitted to Contracting Specialist, Holly Hlavac at Holly.Hlavac@usda.gov.


Attachments/Links
Contact Information
Contracting Office Address
  • SPOC Intermountain 1400 INDEPENDENCE AVE SW, MS-1138
  • Washington , DC 202500001
  • USA
Primary Point of Contact
Secondary Point of Contact
History
  • Mar 25, 2025 02:36 pm CDTPresolicitation (Original)

Related Document

Apr 2, 2025[Presolicitation (Updated)] Hiner Spring Quarry Development, White River National Forest, Blanco Ranger District, Rio Blanco County, Colorado
Jul 10, 2025[Award Notice (Original)] Hiner Spring Quarry Development, White River National Forest, Blanco Ranger District, Rio Blanco County, Colorado
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Engineering - The Eagle County Engineering Department is soliciting proposals from contractors to

Eagle County

Bid Due: 6/26/2026

Description: FY27 PMAA 4291 Bulk Oxygen Department: DNR - Division of Parks &

State Government of Colorado

Bid Due: 6/11/2026

Description: TSC IFB2026000194 Department: Trinidad State Junior College Buyer: Penny Bueno Solicitation Number:

State Government of Colorado

Bid Due: 6/17/2026

Follow Pest Control (Geese Mitigation) Services, Ft Logan National Cemetery Active Contract Opportunity

VETERANS AFFAIRS, DEPARTMENT OF

Bid Due: 6/05/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.