| Location: | North Carolina |
|---|---|
| Posted: | Jul 13, 2026 |
| Due: | Aug 6, 2026 |
| Agency: | City of Charlotte |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FY27-ITBCon-13 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Collective Storm Drainage Improvement Project Series W will include 2 separate projects with this series. 10208 and 10209 Crestwood Drive will include 207 linear feet of new 48" RCP that will connect an existing upstream creek channel to Providence Lake. The 48" RCP installation will be approximately 7-14 feet deep and foundation protection approved by a professional engineer is anticipated. 10208 and 10209 Crestwood Drive anticipates foundation protection at 10201 and 10209 Crestwood Drive. 7211 Quail Meadow Lane will include 717 linear feet of new 42" RCP, 60 linear feet of new 38" x 60" elliptical RCP, and 19 linear feet of new 15" RCP. The new storm pipe system will run along Quail Meadow Lane and outlet on Quail Hollow Homeowners Association Inc. property. The estimated cost of the project is $ 2,919,421.

With GovernmentContracts, you can:
...Bid Number: RFQ2744 Bid Title: Pipe Storage Building Design Category: Formal Bids Status: ...
City of Winston-Salem
Bid Due: 9/04/2026
...: Aluminum Structural Plate Pipe Arch with Headwalls Opening Date: 9/4/2026 2:00 PM ...
State Government of North Carolina
Bid Due: 9/04/2026
...reinforced concrete pipes. Pursuant to Section 143-129 of the General Statutes of North ...
Town of Chapel Hill
Bid Due: 9/18/2026
...seven sites where there will be piers replaced, pipe removed and new piers ...
State Government of North Carolina
Bid Due: 9/17/2026