2023 Water Main Replacement Project 4 - 2 Sites (E. Hildebrand and Camden & Euclid)
When Will Work Occur?
Expecting to Advertise in March 2025 and Construction is currently scheduled to begin in mid-2025
. The estimated construction duration is 15 months and the estimated construction cost is $10.7 million.
E. Hildebrand Site
This project will install approximately 13,300 feet of 8, 10, 12, 16, and 20-inch water main at three sites. One along Camden Street from the intersection with Seymour Street to N St. Mary’s Street. Another along E Euclid Ave from the intersection with N Main Ave to a point approximately 200 feet east of the intersection with McCullough Ave. And another along Hildebrand Ave and Old Hildebrand Ave from the intersection with McCullough Ave to Devine Road. This project is part of ongoing efforts to replace deteriorating water mains that have a history of multiple failures and a high probability of failure.
What to Expect – E. Hildebrand
Camden & Euclid Sites
This project will install approximately 13,300 feet of 8, 10, 12, 16, and 20-inch water main at three sites. One along Camden Street from the intersection with Seymour Street to N St. Mary’s Street. Another along E Euclid Ave from the intersection with N Main Ave to a point approximately 200 feet east of the intersection with McCullough Ave. And another along Hildebrand Ave and Old Hildebrand Ave from the intersection with McCullough Ave to Devine Road. This project is part of ongoing efforts to replace deteriorating water mains that have a history of multiple failures and a high probability of failure.
What to Expect – Camden & Euclid
|
Fact Sheet Jan. 10, 2025 |
|
Questions? Please contact
Lindsay Esquivel
at 210-233-3409
|
Receive Email Updates
|
Registration Agreement

With GovernmentContracts, you can:
...PURCHASE FOR GENERATOR RELOCATION, FUEL TANK CLEANING, AND INSTALLATION SERVICE TO LS 243 ...
San Antonio Water System
Bid Due: 6/24/2026
...and overhaul the existing water main system extending from the holding tank junction ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 6/15/2026
...renewable and fossil fuel energy sources. Installation of a microgrid system that will ...
DEPT OF DEFENSE
Bid Due: 6/29/2026
...and fossil fuel energy sources. Installation of a microgrid system that will have ...
DEPT OF DEFENSE
Bid Due: 6/29/2026