Bid Solicitation: BD-26-1153-ENG01-ENG01-119818
|
|
Header Information
|
|
Bid Number:
|
BD-26-1153-ENG01-ENG01-119818
|
Description:
|
ED 2025-06
|
Bid Opening Date:
|
09/04/2025 09:00:00 AM
|
|
Purchaser:
|
KATLYN LEBOLD
|
Organization:
|
City of Marlborough
|
|
Department:
|
ENG01 - Engineering Division
|
Location:
|
ENG01 - Engineering Division
|
|
Fiscal Year:
|
26
|
Type Code:
|
NS - Non-Statewide Solicitation
|
Allow Electronic Quote:
|
No
|
|
Alternate Id:
|
|
Required Date:
|
|
Available Date
:
|
08/13/2025 09:00:00 AM
|
|
Info Contact:
|
mdascoli@marlborough-ma.gov
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
|
Purchase Method:
|
Open Market
|
|
Pre Bid Conference:
|
|
|
Bulletin Desc:
|
ED 2025-06 Matheson Drive Sewer Pump Station and Force Main Improvements in Marlborough, MA. The project consists of handling of existing wastewater flows and bypass pumping, rehabilitation of existing wet well, modifications to existing wet well and valve vault structures, removal and proper disposal of existing 4-inch PVC force main and installation of new 6-inch PVC force main. Estimated project cost is approximately $900,000.
|
|
|
Ship-to Address:
|
KATLYN MILLER
135 Neil St.
Marlborough, MA 01752
US
Email: kmiller@marlborough-ma.gov
Phone: (508) 624-6910
|
Bill-to Address:
|
KATLYN MILLER
135 Neil St.
Marlborough, MA 01752
US
Email: kmiller@marlborough-ma.gov
Phone: (508) 624-6910
|
Print Format:
|
Bid Print
|
|
Required Quote Attachments
|
|
|
|
Item # 1:
(
83-10
-
15
)
|
Matheson Drive Sewer Pump Station and Force Main Improvements in Marlborough, Massachusetts, CONTRACT NO. ED 2025-06 for the Department of Public Works-Engineering Division in accordance with the documents prepared by Weston & Sampson Engineers, Inc.. The project consists of handling of existing wastewater flows and bypass pumping, rehabilitation of existing wet well with corrosion resistant epoxy lining, modifications to existing wet well and valve vault structures, removal of existing single-phase duplex submersible pumps and associated hardware, servicing existing submersible Pump No. 1 for long term storage, furnish and install new three-phase duplex submersible cutter pumps and associated hardware, installation of new submersible level transducer and digital controller with emergency back-up high level alarm float, install Mission alarm notification system, removal and replacement of existing control panel with a new control panel, installation of VFD to convert single-phase input power to three-phase, installation of new underground electrical conduits, removal and proper disposal of existing fence and installation of new fence, removal and proper disposal of existing liquid propane generator and fuel storage tank, installation of a new liquid propane generator and fuel storage tank, removal and proper disposal of existing 4-inch PVC force main and installation of new 6-inch PVC force main, installation of new water service and yard hydrant, paving of pump station site and driveway, environmental controls, loaming and seeding, landscaping, dewatering as necessary, and all other items required to provide a completed operational sewer pump station as shown and specified in the Matheson Drive Sewer Pump Station and Force Main Improvements contract documents, including all labor, material and equipment necessary to complete the Work. The estimated project cost is approximately $900,000. The Bid Package may be obtained as of 9:00 AM on August 13, 2025 and must be downloaded from Projectdog.com. Project Code 870258. Bidders are strongly encouraged to attend a non-mandatory Pre-Bid Conference to be held at 9:00 AM on Friday, August 22, 2025 at 137 Matheson Drive. Electronic Sealed Bids will be received until 9:00 AM on September 4, 2025 through online submission at www.Projectdog.com.
|
|
U N S P S C Code:
|
83-10-15
Water and sewer utilities
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
|
|
|
|