RFQ for Public Works Wastewater Division On-Call Construction Management Services

Location: California
Posted: Sep 6, 2026
Due: Oct 2, 2026
Agency: City of Pacifica
Type of Government: State & Local
Category:
  • C - Architect and Engineering Services - Construction
  • R - Professional, Administrative and Management Support Services
Publication URL: To access bid details, please log in.


Project ID:

Title: RFQ for Public Works Wastewater Division On-Call Construction Management Services

Addenda: 0

Release Date: 9/4/2026

Due Date: 10/2/2026

Follow
RFQ for Public Works Wastewater Division On-Call Construction Management Services
RFQ
Public Works - Wastewater
Release Date: Friday, September 4, 2026
· Due Date: Friday, October 2, 2026 5:00pm
Posted Friday, September 4, 2026 11:31am
All dates & times in Pacific Time - Los Angeles
Draft Response No Bid
Time Remaining: 25 days, 22 hours, 57 minutes


Post Information

Posted At:Fri, Sep 4, 2026 11:31 AM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

The City of Pacifica (“City”) is seeking a qualified entity or individual (“Company”) to provide Construction Management and Inspection Services for the Public Works Wastewater Division. The City anticipates selecting up to two (2) companies to perform the services.

Bids are requested from Companies that have a demonstrated ability to perform the tasks identified in this Request for Quote ("RFQ").



Background

The City of Pacifica (City) operates the Calera Creek Water Recycling Plant (CCWRP) and its Collection System which have multiple ongoing capital improvement projects being designed and implemented in addition to normal operation, maintenance, and replacement of process equipment, facilities, sewer lines and support systems. Currently, the City is engaged in a variety of tasks to further the design and construction of capital improvement projects in an effort to rehabilitate and upgrade its existing facilities. The City wishes to obtain construction management services from a prequalified short list of firms. These firms will be selected to assist in the administration of the construction contract and provide inspection services to support the upcoming projects. The Agreement(s) will allow staff to support project management needs during the construction phase of upcoming major projects for the City to improve infrastructure and maintain regulatory compliance.

The City seeks consultants with demonstrated expertise and experience working inside treatment process facilities, out in collections systems with sewer pipe replacement (pipe bursting and open trench), as well as providing inspector services.

The following examples are the types of projects that may require construction management services in the future:

Collection System Project

Vallemar and Rockaway Beach Boulevard Areas Sewer Collection System Rehabilitation and Repair Project - Phase I

  • Status: City has 100% design plans and specifications package, waiting on federal funding to bid out
  • Project Description: This is a capital improvement project intended to reduce infiltration/inflow (I&) and improve the resilience of the sanitary sewer collection system throughout the Vallemar and Rockaway Beach Boulevard neighborhoods in the City of Pacifica. This critical project aims to replace roughly 4.5 to 6.5 miles of sewer mainlines between the base bid and additive bid items, ultimately dependent upon the winning contractor's bid and available funding. The project will replace aging sanitary sewer mains with new 6-inch to 8-inch HDPE pipe via pipe bursting and open trench methods. The project will also include reconnection of sewer laterals; existing manhole connections, modifications, and rehabilitation; and new manhole construction; and lamp hole replacement. Additionally, this project includes provisions which allow for the contractor to replace private sewer laterals under separate contracts with property owners. The project will include bypass pumping, temporary shoring/bracing and slope protections, dewatering, water pollution control measures/protections, traffic control measures for vehicles, cyclicsts, and pedestrians, site restoration (planting/landscaping, hardscape, AC, etc.), and coordination with public and City staff. The City anticipates needing one full-time inspector, a part-time cultural resources sinepctor, and a part-time assistant construction manager or project engineer. The inspector will be a 100% on-site position and the assistant construction manager or project engineer is expected to be onsite at least 3 days per week.
  • Estimated Task Order Value: $1 Million
  • Background Documents: Attachment B_Headworks Draft Phase 1 Preliminary Design Report

Calera Creek Water Recycling Plant Project

Headworks Rehabilitation and Improvement Project

  • Status: Anticipate bidding at the end of the year, high-priority project with critical shutdowns affecting the wastewater system in the City, major coordination required
  • Project Description: The Calera Creek Water Recycling Plant (CCWRP) is currently facing limitations with the existing headworks due to the condition of the structure and inability to bypass around the parshall flume. The headworks is a critical preliminary treatment process upstream of the Plant SBR's. The headworks is at the end of its useful life and requires rehabilitation to serve as a reliable preliminary treatment facility for the City. Improvements to the facility include repair of the deteriorated drop box concrete, replacement of the existing Parshall flume, construction of a permanent headworks bypass pipe, and installation of a new odor control pickup point at the drop box to improve hydrogen sulfide capture. Construction sequencing for this project will account for seasonal flow variations at the CCWRP, where weather peak flows can exceed 20 MGD, major coordination with plant staff and contractors will be required for maintaining the plants operation and reliability. The City anticipates needing one full-time inspector, one full-time assistant construction manager or project engineer, and special inspectors as needed. The inspector will be a 100% on-site position and the assistant construction manager or project engineer is expected to be onsite at least 3 days per week.
  • Estimated Task Order Value: $1 Million
  • Background Documents: Attachment C_Vallemar and Rockaway Beach (Phase 1) Basis of Design Report


Timeline

Solicitation Release Date:
September 4, 2026
Question Submission Deadline:
September 18, 2026, 5:00pm
Question Response Deadline:
September 25, 2026, 5:00pm
Quote Submission Deadline:
October 2, 2026, 5:00pm
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...; Inspection Services - Cherry Avenue Sewer Improvement Project (SC-0512) Bid Opening Date ...

City of Long Beach

Bid Due: 10/29/2026

...inspections, 5) sewer inspections, and 6) inspection of grounds, structure, exterior surfaces... inspectors ...

City of Pasadena

Bid Due: 11/06/2026

..., Attachments & Agendas Document: Attachment B - 100% Preliminary Lincoln Street Sanitary ...

City of Stockton

Bid Due: 10/29/2026

...: Attachment B - 100% Preliminary Lincoln Street Sanitary Sewer Pump Station and ...

City of Stockton

Bid Due: 10/29/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.