D6 Rigby Maintenance Building Renovation

Location: Idaho
Posted: Jul 20, 2026
Due: Aug 6, 2026
Agency: State Government of Idaho
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: D266080
Publication URL: To access bid details, please log in.
Number Name Status Bid Close Public Bid Opening Resources & Details Bid Results
D266080 D6 Rigby Maintenance Building Renovation Open 08/06/2026

See Bid Opening Schedule
08/06/2026

See Bid Opening Schedule
Bid Manual

Bid Packages

Project Specifications

Project Manual

Drawings

Attachment Preview

Project Manual for:
ITD D6 Rigby Maintenance Building Renovation,
Rigby, Idaho
July 2026
BID
SET

A200 Elevations
Sections
A300 Building Sections
Windows and Doors
A400 Door & Window Types & Schedules
A401 Door & Window Details
Interiors
A500 Finish Schedule
A501 Main Floor & Second Floor Interior Plan'
A502 Interior Elevations
Reflected Ceiling Plans
A600 Main Floor Reflected Ceiling Plan
Structural
S1.0 General Structural Notes
S1.1 Typical Details
S2.0 Foundation Plan
S2.1 Framing Plan
S3.0 Steel Elevations
S4.0 Foundation Details
S5.0 Framing Details
Plumbing
P100 Plumbing Demolition Plan
P101 Plumbing Floor Plans
P200 Plumbing Schedules & Details
Mechanical
M100 Mechanical Demolition Plan
M101 Mechanical Floor Plans
M200 Mechanical Schedules & Details
Electrical
E000 Electrical Cover
ED100 Main Floor Lighting Demo
ED101 Second Floor Lighting Demo
ED200 Main Floor Power Demo
ED201 Second Floor Power Demo
E100 Main Floor Lighting Install
E101 Second Floor Lighting Install
E200 Main Floor Power Install
E201 Second Floor Power Install
E300 One Line Diagram
E301 Electrical Schedules
ITD D4 Maintenance Shed Remodel and New MHUs, Sublett, ID TOC - 2

Technical Specifications

DIVISION 1 GENERAL REQUIREMENTS
SECTION 01 10 00
SUMMARY
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including Fixed Price Construction
Contract and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Work covered by Contract Documents.
2. Work by Owner.
3. Work under separate contracts.
4. Access to site.
5. Coordination with occupants.
6. Work restrictions.
7. Permits.
8. Waste Disposal.
9. Testing and Inspection.
10. Specification and drawing conventions.
B. Related Requirements:
1. Section 01 50 00 "Temporary Facilities and Controls" for limitations and procedures
governing temporary use of Owner's facilities.
1.3 WORK COVERED BY CONTRACT DOCUMENTS
A. The description of the work includes various architectural, structural, HVAC, plumbing
and electrical improvements. Replacement of existing roof with new standing seam
metal roof, with associated fascia, insulation, interior liner fabric, snow stop, gutter and
downspouts. Replacement of exterior windows, man doors, and windows. Remodel of
an existing restroom and storage space into (2) ADA accessible restrooms with
associated plumbing, electrical and HVAC improvements. Work in shop to include
installation of free standing 5-ton bridge crane with associated foundation, steel
structure, and electrical. Replacement of concrete floor and sewer re-routing per plan.
1.4 WORK BY OWNER
A. General: Cooperate fully with Owner so work may be carried out smoothly, without
interfering with or delaying work under this Contract or work by Owner. Coordinate the
Work of this Contract with work performed by Owner.
B. Items noted NIC (Not in Contract), will be furnished and installed by the Owner/Agency.
ITD D6 Rigby Maintenance Building Renovation, Rigby, ID 01 10 00 - 1

1.5 WORK UNDER SEPARATE CONTRACTS
A. General: Cooperate fully with separate contractors so work on those contracts may be
carried out smoothly, without interfering with or delaying work under this Contract or
other contracts. Coordinate the Work of this Contract with work performed under
separate contracts.
1.6 ACCESS TO SITE
A. General: Contractor shall have full use of Project site for construction operations during
construction period. Contractor's use of Project site is limited only by Owner's right to
perform work or to retain other contractors on portions of Project, and by use of facility
by building tenants in existing tenant improvement Projects.
B. Use of Site: Limit use of Project site to the work in areas indicated. Do not disturb
portions of Project site beyond areas in which the Work is indicated.
1. Limits: Confine construction operations to the areas of work indicated on and in the
drawings and specifications.
2. Driveways, Walkways and Entrances: Keep driveways loading areas, etc. and
entrances serving premises clear and available to Owner, Owner's employees, and
emergency vehicles at all times. Do not use these areas for parking or storage of
materials.
a. Schedule deliveries to minimize use of driveways and entrances by construction
operations.
b. Schedule deliveries to minimize space and time requirements for storage of
materials and equipment on-site.
c. Contractor parking shall be limited to those areas indicated on the Contract
Document and as designed by the Owner.
d. Maintain clear access to project at all times for firefighting equipment. Maintain
exit ways from existing building required by authorities having jurisdiction.
e. Signs: Provide signs adequate to direct visitors.
1) Do not install, or allow to be installed, signs other than specified sign(s) and
signs identifying the principal entities involved in the project.
C. Condition of Existing Building: Maintain portions of existing building affected by
construction operations in a weathertight condition throughout construction period. Any
damage to the building, due to negligence on behalf of the contractor to not maintain a
weather-tight condition, shall be the responsibility of contractors and they shall bear the
burden for correction and/or repairs for any damage. Repair damage caused by
construction operations.
D. Security: The contractor shall maintain security of the building and any staging areas
throughout the project.
1.7 COORDINATION WITH OCCUPANTS
A. Full Owner Occupancy: Owner will occupy site and existing building(s) during entire
construction period. Cooperate with Owner during construction operations to minimize
conflicts and facilitate Owner usage. Perform the Work so as not to interfere with
Owner's day-to-day operations. Maintain existing exits unless otherwise indicated.
1. Maintain access to existing walkways, corridors, and other adjacent occupied or
used facilities. Do not close or obstruct walkways, corridors, or other occupied or
used facilities without written permission from Owner and approval of authorities
having jurisdiction.
ITD D6 Rigby Maintenance Building Renovation, Rigby, ID 01 10 00 - 2

2. Notify Owner not less than 72 hours in advance of activities that will affect Owner's
operations.
3. The Owner will take special care not to damage materials or work completed by the
contractor prior to final acceptance. If the contractor occurs any damages, prior to
final acceptance, they need to notify the Owner and Architect immediately for
verification of damages. If the contractor fails to notify the Owner and Architect within
24 hours of the incident, the contractor shall be responsible for the performance and
shall bear the cost of correction.
1.8 WORK RESTRICTIONS
A. Work Restrictions, General: Comply with restrictions on construction operations.
1. Comply with limitations on use of public streets and with other requirements of
authorities having jurisdiction.
B. On-Site Work Hours: Limit work in the existing building to normal business working
hours of 7:00 a.m. to 6:00 p.m., Monday through Friday, unless otherwise indicated.
C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner
or others unless permitted under the following conditions and then only after providing
temporary utility services according to requirements indicated:
1. Notify Owner not less than 3 days in advance of proposed utility interruptions.
2. Obtain Owner's written permission before proceeding with utility interruptions.
D. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of
noise and vibration, odors, or other disruption to Owner occupancy with Owner.
1. Notify Owner not less than 2 days in advance of proposed disruptive operations.
E. Hazardous Materials: Notify the Design Professional and Owner immediately upon
discovery of existing hazardous materials.
F. Nonsmoking Building: Smoking is not permitted within the building or on Idaho
Transportation Department property.
G. Controlled Substances: Use of tobacco products and other controlled substances is not
permitted per Section 72-1717, Idaho Code.
H. Contractor Parking: Coordinate with Idaho Transportation Department for Contractor
parking.
I. On Owner/Tenant occupied projects, maintain cleanliness in areas adjacent to and
surrounding the construction area to the satisfaction of the Owner at all times.
J. On Owner/Tenant occupied projects, ensure deliveries and contractor work access are
in accordance with previous agreement with Owner and/or as indicated in the Contract
Documents.
1.9 PERMITS
A. Furnish all necessary permits for construction of the Work.
ITD D6 Rigby Maintenance Building Renovation, Rigby, ID 01 10 00 - 3

1.10 WASTE DISPOSAL
A. The contractor is responsible for any and all demolition and/or removal as necessary
and required to fulfill the requirements of the Contract Documents.
1.11 TESTING AND INSPECTION
A. Notify Owner/Engineer at least 24 hours prior to commencement of Work requiring
special inspection.
1.12 SPECIFICATION AND DRAWING CONVENTIONS
A. Specification Content: The Specifications use certain conventions for the style of
language and the intended meaning of certain terms, words, and phrases when used in
particular situations. These conventions are as follows:
1. Imperative mood and streamlined language are generally used in the Specifications.
The words "shall," "shall be," or "shall comply with," depending on the context, are
implied where a colon (:) is used within a sentence or phrase.
2. Specification requirements are to be performed by Contractor unless specifically
stated otherwise.
B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the
Work of all Sections in the Specifications.
C. Drawing Coordination: Requirements for materials and products identified on Drawings
are described in detail in the Specifications. One or more of the following are used on
Drawings to identify materials and products:
1. Terminology: Materials and products are identified by the typical generic terms used
in the individual Specifications Sections.
2. Abbreviations: Materials and products are identified by abbreviations published as
part of the U.S. National CAD Standard and scheduled on Drawings.
3. Keynoting: Materials and products are identified by reference keynotes referencing
Specification Section numbers found in this Project Manual.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION
ITD D6 Rigby Maintenance Building Renovation, Rigby, ID 01 10 00 - 4

SECTION 01 25 00
SUBSTITUTION PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for substitutions.
B. Related Requirements:
1. Section 01 60 00 "Product Requirements" for requirements for submitting
comparable product submittals for products by listed manufacturers.
1.2 DEFINITIONS
A. Substitutions: Changes in products, materials, equipment, and methods of construction
from those required by the Contract Documents and proposed by Contractor.
1. Substitutions for Cause: Changes proposed by Contractor that are required due to
changed Project conditions, such as unavailability of product, regulatory changes, or
unavailability of required warranty terms.
2. Substitutions for Convenience: Changes proposed by Contractor or Owner that are
not required in order to meet other Project requirements but may offer advantage to
Contractor or Owner.
1.3 ACTION SUBMITTALS
A. Substitution Requests: Submit three copies of each request for consideration. Identify
product or fabrication or installation method to be replaced. Include Specification Section
number and title and Drawing numbers and titles.
1. Documentation: Show compliance with requirements for substitutions and the
following, as applicable:
a. Statement indicating why specified product or fabrication or installation method
cannot be provided, if applicable.
b. Coordination of information, including a list of changes or revisions needed to
other parts of the Work and to construction performed by Owner and separate
contractors that will be necessary to accommodate proposed substitution.
c. Detailed comparison of significant qualities of proposed substitutions with those
of the Work specified. Include annotated copy of applicable Specification Section.
Significant qualities may include attributes, such as performance, weight, size,
durability, visual effect, sustainable design characteristics, warranties, and
specific features and requirements indicated. Indicate deviations, if any, from the
Work specified.
d. Product Data, including drawings and descriptions of products and fabrication
and installation procedures.
e. Samples, where applicable or requested.
f. Certificates and qualification data, where applicable or requested.
g. List of similar installations for completed projects, with project names and
addresses as well as names and addresses of architects and owners.
h. Material test reports from a qualified testing agency, indicating and interpreting
test results for compliance with requirements indicated.
ITD D6 Rigby Maintenance Building Renovation, Rigby, ID 01 25 00 - 1

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow VHA seeking 20,250 RSF for a Community Based Outreach Clinic in Twin

VETERANS AFFAIRS, DEPARTMENT OF

Bid Due: 9/18/2026

Follow 124 MOC RADIO SYSTEM PROCUREMENT AND INSTALL Active Contract Opportunity Notice ID

DEPT OF DEFENSE

Bid Due: 9/21/2026

Project: Lawn Care and Landscape Maintenance Services Ref. #: S-27-26001-2032 Type: RFP Status:

West Ada School District (WASD)

Bid Due: 9/17/2026

Project: RFSQ Roofing Contractors - Category B Ref. #: RFSQ-27-272-2034 Type: RFSQ Status:

West Ada School District (WASD)

Bid Due: 9/29/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.